ITAC Assessment: AM0013
ITAC logo
ITAC Assessment: AM0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product INJECTION-MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 27
Plant Area
n/a
Annual Production 3,238,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,121 1,055,979
kWh
Natural Gas $450 62
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,173

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $367 $1,070 $367
11,430
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $187 $53 $187
3,810
kWh
-
03 2.4312: Improve lubrication practices $204 $100 $204
6,155
kWh
-
04 3.4154: Eliminate leaks in water lines and valves $113 $100 - $113
05 2.7142: Utilize higher efficiency lamps and/or ballasts $71 $58 $71
586
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $120 - $120
3,810
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $111 - $111
3,517
kWh
-
08 2.3191: Use demand controller or load shedder $1,995 $2,000 $1,995
-
kWh
-
TOTAL RECOMMENDED $3,168 $3,381 $3,055
29,308
kWh
$113
TOTAL IMPLEMENTED $1,173 $1,381 $1,060
29,308
kWh
$113
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs