Assessment Year | 1987 |
---|---|
Principal Product | INJECTION-MOLDED PLASTIC |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 27 |
Plant Area |
n/a
|
Annual Production | 3,238,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,121 | 1,055,979 |
kWh
|
$0.047 |
Natural Gas | $450 | 62 |
MMBtu
|
$7.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,168 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,173 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $367 | $1,070 |
$367
11,430
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $187 | $53 |
$187
3,810
kWh
|
- | |
03 | 2.4312: Improve lubrication practices | $204 | $100 |
$204
6,155
kWh
|
- | |
04 | 3.4154: Eliminate leaks in water lines and valves | $113 | $100 | - | $113 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $71 | $58 |
$71
586
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $120 | - |
$120
3,810
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $111 | - |
$111
3,517
kWh
|
- | |
08 | 2.3191: Use demand controller or load shedder | $1,995 | $2,000 |
$1,995
-
kWh
|
- | |
TOTAL RECOMMENDED | $3,168 | $3,381 |
$3,055
29,308
kWh
|
$113 | ||
TOTAL IMPLEMENTED | $1,173 | $1,381 |
$1,060
29,308
kWh
|
$113 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs