Assessment Year | 2022 |
---|---|
Principal Product | Medium Duty Truck |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $50 M to 100M |
# of Employees | 375 |
Plant Area |
970,000
ft2
|
Annual Production | 13,500
units
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $154,857 | 3,822,182 |
kWh
|
$0.041 | |
Electricity Demand | $163,386 | 10,308 |
kW-mo/yr
|
$15.85 | |
Natural Gas | $58,492 | 8,332 |
MMBtu
|
$7.02 | |
Waste Disposal Costs | |||||
Water Usage | $2,659 | 444,645 |
Tgal
|
$0.006 | |
Water Disposal | $3,001 | 444,645 |
Tgal
|
$0.007 | |
Other Liquid (non-haz) | $15,321 | 14,056 |
gal
|
$1.09 | |
TOTAL YEARLY COSTS | $397,716 | ||||
RECOMMENDED SAVINGS* | $53,983 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $12,412 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $13,903 | $67,984 |
$739
18,252
kWh
|
$507
-
kW-mo/yr
|
$12,657
-
MMBtu
|
- | - | - | |
02 | 3.3131: Use evaporation to concentrate material | $9,086 | $4,900 |
$(-1,068.0)
(-26,370)
kWh
|
$(-571.0)
-
kW-mo/yr
|
- |
$10,725
-
gal
|
- | - | |
03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $7,597 | $37,000 |
$1,406
34,706
kWh
|
$2,932
-
kW-mo/yr
|
$7,259
-
MMBtu
|
- | $(-4,000.0) | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,233 | $660 |
$2,017
49,803
kWh
|
$4,216
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7245: Use direct air supply to exhaust hoods | $4,159 | $8,300 |
$582
14,365
kWh
|
$1,696
-
kW-mo/yr
|
$1,881
-
MMBtu
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,394 | $7,905 |
$1,354
33,439
kWh
|
$2,790
-
kW-mo/yr
|
- | - | $(-750.0) | - | |
07 | 2.3212: Optimize plant power factor | $2,785 | $7,090 | - | - | - | - | - | $2,785 | |
08 | 2.4224: Upgrade controls on compressors | $2,669 | $3,970 |
$1,449
35,784
kWh
|
$1,220
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $2,129 | $1,773 |
$687
16,952
kWh
|
$1,442
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.1321: Replace fossil fuel equipment with electrical equipment | $2,028 | $9,280 |
$(-1,185.0)
(-29,250)
kWh
|
$(-2,473.0)
-
kW-mo/yr
|
$5,686
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $53,983 | $148,862 |
$5,981
147,681
kWh
|
$11,759
-
kW-mo/yr
|
$27,483
-
MMBtu
|
$10,725
-
gal
|
$(-4,750.0) | $2,785 | ||
TOTAL IMPLEMENTED | $12,412 | $15,655 |
$3,371
83,242
kWh
|
$7,006
-
kW-mo/yr
|
- | - | $(-750.0) | $2,785 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs