41
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0022 #03 Y:2012 | 03 | 2012 | Insulate bare equipment | $2,744 | $2,303 | |
| WM0022 #02 Y:2012 | 02 | 2012 | Install vinyl strip / high speed / air curtain doors | $2,779 | $6,480 | |
| WM0022 #01 Y:2012 | 01 | 2012 | Optimize plant power factor | $12,280 | $30,697 | |
| IP0006 #07 Y:2012 | 07 | 2012 | Use demand controller or load shedder | $36,010 | $171,310 | |
| IP0006 #06 Y:2012 | 06 | 2012 | Reduce illumination to minimum necessary levels | $18,261 | $92,692 | |
| IP0006 #05 Y:2012 | 05 | 2012 | Install compressor air intakes in coolest locations | $490 | $1,156 | |
| IP0006 #04 Y:2012 | 04 | 2012 | Recover waste heat from equipment | $1,847 | $1,416 | |
| IP0006 #03 Y:2012 | 03 | 2012 | Install occupancy sensors | $1,771 | $730 | |
| IP0006 #02 Y:2012 | 02 | 2012 | Reduce the pressure of compressed air to the minimum required | $980 | - | |
| IP0006 #01 Y:2012 | 01 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,520 | - | |
| WV0453 #12 Y:2012 | 12 | 2012 | Remove or close off unneeded compressed air lines | $115 | $100 | |
| WV0453 #11 Y:2012 | 11 | 2012 | Direct warmest air to combustion intake | $251 | $800 | |
| WV0453 #10 Y:2012 | 10 | 2012 | Reduce the pressure of compressed air to the minimum required | $753 | $25 | |
| WV0453 #09 Y:2012 | 09 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $834 | $375 | |
| WV0453 #08 Y:2012 | 08 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $981 | $1,400 | |
| WV0453 #07 Y:2012 | 07 | 2012 | Establish a predictive maintenance program | $1,239 | $1,000 | |
| WV0453 #06 Y:2012 | 06 | 2012 | Install timers and/or thermostats | $1,960 | $2,450 | |
| WV0453 #05 Y:2012 | 05 | 2012 | Develop a repair/replace policy | $2,222 | $938 | |
| WV0453 #04 Y:2012 | 04 | 2012 | Utilize energy-efficient belts and other improved mechanisms | $4,045 | - | |
| WV0453 #03 Y:2012 | 03 | 2012 | Replace obsolete burners with more efficient ones | $4,494 | $12,500 |