ITAC Assessment: WV0453
ITAC logo
ITAC Assessment: WV0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product commercial printing forms
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 156,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,378 3,457,920
kWh
Electricity Demand $100,128 10,013
kW-mo/yr
Natural Gas $43,117 4,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,920 - - $13,320
-
kW-mo/yr
- $(-2,400.0)
02 2.7135: Install occupancy sensors $9,963 $2,600 $7,713
164,240
kWh
$2,250
-
kW-mo/yr
- -
03 2.1221: Replace obsolete burners with more efficient ones $4,494 $12,500 - - $4,494
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,045 - $2,995
63,787
kWh
$1,050
-
kW-mo/yr
- -
05 2.4151: Develop a repair/replace policy $2,222 $938 $2,102
44,752
kWh
$720
-
kW-mo/yr
- $(-600.0)
06 2.7261: Install timers and/or thermostats $1,960 $2,450 - - $1,960
-
MMBtu
-
07 2.4157: Establish a predictive maintenance program $1,239 $1,000 $2,102
44,752
kWh
$720
-
kW-mo/yr
- $(-1,583.0)
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $981 $1,400 $581
12,382
kWh
$400
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $834 $375 $644
13,723
kWh
$190
-
kW-mo/yr
- -
10 2.4231: Reduce the pressure of compressed air to the minimum required $753 $25 $583
12,415
kWh
$170
-
kW-mo/yr
- -
11 2.1213: Direct warmest air to combustion intake $251 $800 $89
1,890
kWh
- $162
-
MMBtu
-
12 2.4235: Remove or close off unneeded compressed air lines $115 $100 $115
2,444
kWh
- - -
TOTAL RECOMMENDED $37,777 $22,188 $16,924
360,385
kWh
$18,820
-
kW-mo/yr
$6,616
-
MMBtu
$(-4,583.0)
TOTAL IMPLEMENTED $13,108 $1,475 $2,861
60,919
kWh
$14,230
-
kW-mo/yr
- $(-3,983.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs