Assessment Year | 2022 |
---|---|
Principal Product | Electro plating and metal finikshing |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $50 M to 100M |
# of Employees | 45 |
Plant Area |
50,000
ft2
|
Annual Production | 6,000,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $128,487 | 2,399,440 |
kWh
|
$0.054 | |
Electricity Demand | $62,522 | 6,175 |
kW-mo/yr
|
$10.13 | |
Electricity Fees | $2,976 | - |
|
- | |
Natural Gas | $79,250 | 7,132 |
MMBtu
|
$11.11 | |
Waste Disposal Costs | |||||
Water Usage | $17,475 | 9,818 |
Tgal
|
$1.78 | |
Water Disposal | $2,516 | 9,818 |
Tgal
|
$0.26 | |
TOTAL YEARLY COSTS | $293,226 | ||||
RECOMMENDED SAVINGS* | $22,823 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $9,344 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,361 | $5,404 |
$4,935
91,975
kWh
|
$1,425
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,972 | $3,155 |
$4,857
90,514
kWh
|
$2,115
-
kW-mo/yr
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $7,119 | $11,200 |
$5,657
105,419
kWh
|
$1,462
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,584 | $602 |
$1,150
21,437
kWh
|
$434
-
kW-mo/yr
|
- | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $787 | $1,511 | - | - |
$787
-
Tgal
|
|
TOTAL RECOMMENDED | $22,823 | $21,871 |
$16,600
309,345
kWh
|
$5,436
-
kW-mo/yr
|
$787
-
Tgal
|
||
TOTAL IMPLEMENTED | $9,344 | $5,268 |
$6,007
111,951
kWh
|
$2,549
-
kW-mo/yr
|
$787
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs