Assessment Year | 1992 |
---|---|
Principal Product | SPACK VEHICLES & SYSTEMS |
NAICS |
n/a
|
SIC | 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 860 |
Plant Area |
n/a
|
Annual Production | 1
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $407,510 | 6,026,671 |
kWh
|
$0.068 |
Natural Gas | $15,831 | 2,644 |
MMBtu
|
$5.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,502 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7123: Keep lamps and reflectors clean | $39,436 | $109,150 |
$39,436
583,236
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,461 | $26,270 |
$1,461
21,688
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,863 | $1,536 |
$1,863
27,550
kWh
|
- | - | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $21,332 | - |
$21,332
315,358
kWh
|
- | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,167 | $45,000 |
$51,319
758,793
kWh
|
$(-44,152.0)
-
MMBtu
|
$(-2,000.0) | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,648 | $25,404 |
$3,648
53,927
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $565 | $4,799 |
$565
8,499
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,030 | $900 |
$1,030
15,240
kWh
|
- | - | |
TOTAL RECOMMENDED | $74,502 | $213,059 |
$120,654
1,784,291
kWh
|
$(-44,152.0)
-
MMBtu
|
$(-2,000.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs