ITAC Assessment: AS0068
ITAC logo
ITAC Assessment: AS0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SPACK VEHICLES & SYSTEMS
NAICS
n/a
SIC 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 860
Plant Area
n/a
Annual Production 1
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $407,510 6,026,671
kWh
Natural Gas $15,831 2,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $39,436 $109,150 $39,436
583,236
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,461 $26,270 $1,461
21,688
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,863 $1,536 $1,863
27,550
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $21,332 - $21,332
315,358
kWh
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,167 $45,000 $51,319
758,793
kWh
$(-44,152.0)
-
MMBtu
$(-2,000.0)
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,648 $25,404 $3,648
53,927
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $565 $4,799 $565
8,499
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,030 $900 $1,030
15,240
kWh
- -
TOTAL RECOMMENDED $74,502 $213,059 $120,654
1,784,291
kWh
$(-44,152.0)
-
MMBtu
$(-2,000.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs