Assessment Year | 1998 |
---|---|
Principal Product | Extruded/Molded PTFE |
NAICS |
n/a
|
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
61,150
ft2
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $178,387 | 2,667,644 |
kWh
|
$0.067 |
Electricity Demand | $91,421 | 6,596 |
kW-mo/yr
|
$13.86 |
LPG | $253,179 | 47,146 |
MMBtu
|
$5.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $177,045 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,498 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $47,834 | $5,100 |
$2,371
37,222
kWh
|
- | - |
$45,463
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $53,137 | $200,000 |
$27,492
431,125
kWh
|
$35,666
-
kW-mo/yr
|
- |
$(-10,021.0)
-
MMBtu
|
|
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $62,915 | $200,000 |
$32,745
513,482
kWh
|
$42,106
-
kW-mo/yr
|
- |
$(-11,936.0)
-
MMBtu
|
|
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,174 | $10,000 |
$4,956
77,960
kWh
|
- | - |
$(-1,782.0)
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $1,748 | $2,019 | - | - | - |
$1,748
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,750 | $17,906 |
$4,747
74,443
kWh
|
$2,003
-
kW-mo/yr
|
- | - | |
07 | 2.3212: Optimize plant power factor | $1,487 | $5,700 | - | - | $1,487 | - | |
TOTAL RECOMMENDED | $177,045 | $440,725 |
$72,311
1,134,232
kWh
|
$79,775
-
kW-mo/yr
|
$1,487 |
$23,472
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,498 | $19,925 |
$4,747
74,443
kWh
|
$2,003
-
kW-mo/yr
|
- |
$1,748
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs