ITAC Assessment: MA0415
ITAC logo
ITAC Assessment: MA0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Extruded/Molded PTFE
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 61,150
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,387 2,667,644
kWh
Electricity Demand $91,421 6,596
kW-mo/yr
LPG $253,179 47,146
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $177,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,498

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $47,834 $5,100 $2,371
37,222
kWh
- - $45,463
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $53,137 $200,000 $27,492
431,125
kWh
$35,666
-
kW-mo/yr
- $(-10,021.0)
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $62,915 $200,000 $32,745
513,482
kWh
$42,106
-
kW-mo/yr
- $(-11,936.0)
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,174 $10,000 $4,956
77,960
kWh
- - $(-1,782.0)
-
MMBtu
05 2.2437: Recover waste heat from equipment $1,748 $2,019 - - - $1,748
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,750 $17,906 $4,747
74,443
kWh
$2,003
-
kW-mo/yr
- -
07 2.3212: Optimize plant power factor $1,487 $5,700 - - $1,487 -
TOTAL RECOMMENDED $177,045 $440,725 $72,311
1,134,232
kWh
$79,775
-
kW-mo/yr
$1,487 $23,472
-
MMBtu
TOTAL IMPLEMENTED $8,498 $19,925 $4,747
74,443
kWh
$2,003
-
kW-mo/yr
- $1,748
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs