Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

237

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0045 #08 Y:2025 Use most efficient type of electric motors $1,247 $910
CI0045 #07 Y:2025 Recover waste heat from equipment $3,694 $5,000
CI0045 #06 Y:2025 Use or replace with energy efficient substitutes $4,072 $25,000
CI0045 #05 Y:2025 Insulate bare equipment $13,658 $2,310
CI0045 #04 Y:2025 Use photocell controls $36,786 $6,000
CI0045 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $75,467 $293,581
CI0045 #02 Y:2025 Use battery storage for demand control $118,038 $200,000
CI0045 #01 Y:2025 Use solar heat to make electricty $360,332 $3,128,595
UA0287 #07 Y:2024 Use solar heat to make electricty $87,903 $414,460
UA0287 #06 Y:2024 Recover waste heat from equipment $5,375 $8,397
UA0287 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $25,986 $8,591
UA0287 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $6,926 $1,000
UA0287 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $64 $183
UA0287 #02 Y:2024 Install timers and/or thermostats $300 $108
UA0287 #01 Y:2024 Install occupancy sensors $6,007 $1,191
NT0014 #05 Y:2023 Lower temperature during the winter season and vice-versa $5,512 -
NT0014 #04 Y:2023 Optimize plant power factor $2,486 $1,441
NT0014 #03 Y:2023 Lower temperature during the winter season and vice-versa $955 -
NT0014 #02 Y:2023 Clean or color roof to reduce solar load $6,006 $6,160
NT0014 #01 Y:2023 Analyze flue gas for proper air/fuel ratio $9,483 $1,258