ITAC Assessment: CI0045
ITAC logo
ITAC Assessment: CI0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Shelf Liner, Grip
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2675: Die-Cut Paper and Paperboard and Cardboard
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 250,000
ft2
Annual Production 9,732,000
units
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,158 1,344,056
kWh
Electricity Demand $146,762 7,358
kW-mo/yr
Electricity Fees $59,448 -
Natural Gas $40,344 3,806
MMBtu
Other Gas $10,145 1
MMBtu
TOTAL YEARLY COSTS $412,857
RECOMMENDED SAVINGS* $613,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $360,332 $3,128,595 $274,212
2,359,829
kWh
$86,120
-
kW-mo/yr
- - -
02 2.3141: Use battery storage for demand control $118,038 $200,000 $118,038
1,015,820
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $75,467 $293,581 $46,246
397,986
kWh
$23,721
-
kW-mo/yr
- - $5,500
04 2.7134: Use photocell controls $36,786 $6,000 $15,181
130,647
kWh
$16,426
-
kW-mo/yr
- $208 $4,971
05 2.2511: Insulate bare equipment $13,658 $2,310 - - $13,658
-
MMBtu
- -
06 2.4322: Use or replace with energy efficient substitutes $4,072 $25,000 $4,072
35,041
kWh
- - - -
07 2.2437: Recover waste heat from equipment $3,694 $5,000 - - $3,694
-
MMBtu
- -
08 2.4133: Use most efficient type of electric motors $1,247 $910 $909
7,826
kWh
$338
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $613,294 $3,661,396 $458,658
3,947,149
kWh
$126,605
-
kW-mo/yr
$17,352
-
MMBtu
$208 $10,471
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs