ITAC Assessment: NT0014
ITAC logo
ITAC Assessment: NT0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Food Packaging
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $1
M
to 5
M
# of Employees 289
Plant Area 150,000
ft2
Annual Production 3,200,000,000
units
Production Hrs. Annual 8,064
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,608,172 22,347,208
kWh
Electricity Demand $80,450 7,449
kW-mo/yr
Natural Gas $237,078 19,909
MMBtu
Waste Disposal Costs
Water Usage $186,879 19,167
Tgal
TOTAL YEARLY COSTS $2,112,579
RECOMMENDED SAVINGS* $24,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,483 $1,258 - - $9,483
-
MMBtu
02 2.7425: Clean or color roof to reduce solar load $6,006 $6,160 $3,234
44,917
kWh
$2,772
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $955 - $955
13,271
kWh
- -
04 2.3212: Optimize plant power factor $2,486 $1,441 - $2,486
-
kW-mo/yr
-
05 2.7221: Lower temperature during the winter season and vice-versa $5,512 - $5,512
76,561
kWh
- -
TOTAL RECOMMENDED $24,442 $8,858 $9,701
134,748
kWh
$5,258
-
kW-mo/yr
$9,483
-
MMBtu
TOTAL IMPLEMENTED $24,442 $8,858 $9,701
134,748
kWh
$5,258
-
kW-mo/yr
$9,483
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs