Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Stationery product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0412 #04 Y:2023 Use solar heat to make electricty $10,030 $96,425
MS0412 #03 Y:2023 Lower temperature during the winter season and vice-versa $108 -
MS0412 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $6,039 $17,808
MS0412 #01 Y:2023 Install occupancy sensors $3,382 $1,476
LE0469 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $10,425 $18,125
LE0469 #04 Y:2018 Replace existing hvac unit with high efficiency model $18,723 $23,000
LE0469 #03 Y:2018 Recover waste heat from equipment $5,321 $6,000
LE0469 #02 Y:2018 Utilize energy-efficient belts and other improved mechanisms $159 $175
LE0469 #01 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $5,507 $1,000
AS0455 #07 Y:2018 Pay bills on time to avoid late fees $15,576 -
AS0455 #06 Y:2018 Modify process to reduce material use/cost $1,556 -
AS0455 #05 Y:2018 Add equipment/ operators to reduce production bottleneck $114,480 $30,000
AS0455 #04 Y:2018 Utilize higher efficiency lamps and/or ballasts $10,551 $12,598
AS0455 #03 Y:2018 Use most efficient type of electric motors $18,097 $36,012
AS0455 #02 Y:2018 Reduce the pressure of compressed air to the minimum required $6,768 $800
AS0455 #01 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $7,307 $180
LE0427 #06 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,186 $5,500
LE0427 #05 Y:2016 Recover waste heat from equipment $1,580 $3,500
LE0427 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,621 $5,775
LE0427 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $12,823 $14,438