514
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Paper bag and coated and treated paper manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0692 #08 Y:2012 | 08 | 2012 | Use cooling tower or economizer to replace chiller cooling | $1,013 | $3,000 | |
| MA0692 #07 Y:2012 | 07 | 2012 | Utilize higher efficiency lamps and/or ballasts | $1,135 | $3,260 | |
| MA0692 #06 Y:2012 | 06 | 2012 | Eliminate or reduce compressed air usage | $1,145 | $3,183 | |
| MA0692 #05 Y:2012 | 05 | 2012 | Install compressor air intakes in coolest locations | $2,162 | $7,150 | |
| MA0692 #04 Y:2012 | 04 | 2012 | Reduce the pressure of compressed air to the minimum required | $2,509 | $200 | |
| MA0692 #03 Y:2012 | 03 | 2012 | Insulate bare equipment | $3,685 | $2,500 | |
| MA0692 #02 Y:2012 | 02 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $28,554 | $33,000 | |
| MA0692 #01 Y:2012 | 01 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $43,573 | $24,000 | |
| UM0395 #06 Y:2011 | 06 | 2011 | Install / repair insulation on steam lines | $222 | $161 | |
| UM0395 #05 Y:2011 | 05 | 2011 | Heat water with exhaust heat | $798 | $2,261 | |
| UM0395 #04 Y:2011 | 04 | 2011 | Recover waste heat from equipment | $51,920 | $110,521 | |
| UM0395 #03 Y:2011 | 03 | 2011 | Utilize higher efficiency lamps and/or ballasts | $2,425 | $15,571 | |
| UM0395 #02 Y:2011 | 02 | 2011 | Upgrade controls on compressors | $8,974 | $8,890 | |
| UM0395 #01 Y:2011 | 01 | 2011 | Install compressor air intakes in coolest locations | $6,323 | $5,000 | |
| SF0403 #09 Y:2011 | 09 | 2011 | Use photocell controls | $912 | $5,037 | |
| SF0403 #08 Y:2011 | 08 | 2011 | Use / purchase optimum sized compressor | $1,944 | $9,877 | |
| SF0403 #07 Y:2011 | 07 | 2011 | Utilize controls to operate equipment only when needed | $4,142 | $15,378 | |
| SF0403 #06 Y:2011 | 06 | 2011 | Install occupancy sensors | $1,801 | $5,900 | |
| SF0403 #05 Y:2011 | 05 | 2011 | Utilize controls to operate equipment only when needed | $5,026 | $14,750 | |
| SF0403 #04 Y:2011 | 04 | 2011 | Replace electrically-operated equipment with fossil fuel equipment | $8,148 | $20,097 |