514
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Paper bag and coated and treated paper manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0100 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $830 | $4,500 | |
| TT0100 #02 Y:2012 | 02 | 2012 | Install occupancy sensors | $407 | $150 | |
| TT0100 #01 Y:2012 | 01 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,700 | $3,000 | |
| MAS030 #06 Y:2012 | 06 | 2012 | Lower temperature during the winter season and vice-versa | $1,098 | $500 | |
| MAS030 #05 Y:2012 | 05 | 2012 | Install occupancy sensors | $2,333 | $4,400 | |
| MAS030 #04 Y:2012 | 04 | 2012 | Reduce the pressure of compressed air to the minimum required | $2,379 | - | |
| MAS030 #03 Y:2012 | 03 | 2012 | Reduce the pressure of compressed air to the minimum required | $3,092 | - | |
| MAS030 #02 Y:2012 | 02 | 2012 | Minimize operation of equipment maintained in standby condition | $5,241 | $1,500 | |
| MAS030 #01 Y:2012 | 01 | 2012 | Minimize operation of equipment maintained in standby condition | $8,427 | $2,500 | |
| NC0465 #11 Y:2012 | 11 | 2012 | Minimize boiler blowdown with better feedwater treatment | $1,007 | $1,000 | |
| NC0465 #10 Y:2012 | 10 | 2012 | Insulate feedwater tank | $464 | $1,150 | |
| NC0465 #09 Y:2012 | 09 | 2012 | Increase amount of condensate returned | $2,179 | $1,000 | |
| NC0465 #08 Y:2012 | 08 | 2012 | Analyze flue gas for proper air/fuel ratio | $2,343 | $1,200 | |
| NC0465 #07 Y:2012 | 07 | 2012 | Use heat from boiler blowdown to preheat boiler feed water | $7,419 | $16,000 | |
| NC0465 #06 Y:2012 | 06 | 2012 | Increase amount of condensate returned | $2,959 | $3,000 | |
| NC0465 #05 Y:2012 | 05 | 2012 | Reduce excessive boiler blowdown | $512 | - | |
| NC0465 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $26,645 | $45,006 | |
| NC0465 #03 Y:2012 | 03 | 2012 | Recover waste heat from equipment | $5,615 | $10,250 | |
| NC0465 #02 Y:2012 | 02 | 2012 | Reduce the pressure of compressed air to the minimum required | $2,440 | $200 | |
| NC0465 #01 Y:2012 | 01 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $807 | $400 |