ITAC Assessment: TT0100
ITAC logo
ITAC Assessment: TT0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Flexographic Packaging
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 117,000
ft2
Annual Production 1,000,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,940 5,759,700
kWh
Electricity Demand $150,367 11,213
kW-mo/yr
Electricity Fees $(-27,835.0) -
Natural Gas $87,470 14,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,700 $3,000 $4,043
64,190
kWh
$1,657
-
kW-mo/yr
02 2.7135: Install occupancy sensors $407 $150 $289
4,592
kWh
$118
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $830 $4,500 $589
9,360
kWh
$241
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $126 $360 $90
1,422
kWh
$37
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $660 $3,000 $469
7,438
kWh
$192
-
kW-mo/yr
TOTAL RECOMMENDED $7,724 $11,010 $5,479
87,002
kWh
$2,245
-
kW-mo/yr
TOTAL IMPLEMENTED $7,724 $11,010 $5,479
87,002
kWh
$2,245
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs