ITAC Assessment: MAS030
ITAC logo
ITAC Assessment: MAS030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Paperboard folding cartons
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 150,000
ft2
Annual Production 208,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $524,002 4,352,394
kWh
Electricity Demand $175,135 18,181
kW-mo/yr
Electricity Fees $15,600 -
Fuel Oil #2 $137,374 5,519
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $8,427 $2,500 $8,427
69,992
kWh
02 2.6242: Minimize operation of equipment maintained in standby condition $5,241 $1,500 $5,241
43,534
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,092 - $3,092
25,660
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,379 - $2,379
19,760
kWh
05 2.7135: Install occupancy sensors $2,333 $4,400 $2,333
19,380
kWh
06 2.7221: Lower temperature during the winter season and vice-versa $1,098 $500 $1,098
9,121
kWh
TOTAL RECOMMENDED $22,570 $8,900 $22,570
187,447
kWh
TOTAL IMPLEMENTED $5,471 - $5,471
45,420
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs