533
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Paper bag and coated and treated paper manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0650 #09 Y:2026 | 09 | 2026 | Replace existing equipment with more suitable substitutes | $25,000 | $3,560 |
n/a
|
| UF0650 #08 Y:2026 | 08 | 2026 | Improve space comfort conditioning | $56,488 | $22,740 |
n/a
|
| UF0650 #07 Y:2026 | 07 | 2026 | Analyze flue gas for proper air/fuel ratio | $5,076 | - |
n/a
|
| UF0650 #06 Y:2026 | 06 | 2026 | Minimize condenser cooling water temperature | $11,638 | $28,395 |
n/a
|
| UF0650 #05 Y:2026 | 05 | 2026 | Substitute compressed air cooling with water or air cooling | $12,689 | $2,700 |
n/a
|
| UF0650 #04 Y:2026 | 04 | 2026 | Reduce the pressure of compressed air to the minimum required | $23,113 | - |
n/a
|
| UF0650 #03 Y:2026 | 03 | 2026 | Utilize controls to operate equipment only when needed | $58,159 | $7,500 |
n/a
|
| UF0650 #02 Y:2026 | 02 | 2026 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $203,555 | $244,447 |
n/a
|
| UF0650 #01 Y:2026 | 01 | 2026 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $347,581 | $1,529,500 |
n/a
|
| IP0221 #06 Y:2026 | 06 | 2026 | Insulate bare equipment | $207 | $965 |
n/a
|
| IP0221 #05 Y:2026 | 05 | 2026 | Eliminate or reduce compressed air usage | $3,510 | $7,020 |
n/a
|
| IP0221 #04 Y:2026 | 04 | 2026 | Meter recycled water (to reduce sewer charges) | $10,527 | $5,080 |
n/a
|
| IP0221 #03 Y:2026 | 03 | 2026 | Turn off equipment when not in use | $5,246 | $160 |
n/a
|
| IP0221 #02 Y:2026 | 02 | 2026 | Install compressor air intakes in coolest locations | $17,242 | $542 |
n/a
|
| IP0221 #01 Y:2026 | 01 | 2026 | Eliminate or reduce compressed air usage | $34,793 | - |
n/a
|
| WM0263 #04 Y:2026 | 04 | 2026 | Reduce space conditioning during non-working hours | $191 | $100 |
n/a
|
| WM0263 #03 Y:2026 | 03 | 2026 | Utilize higher efficiency lamps and/or ballasts | $325 | $250 |
n/a
|
| WM0263 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,056 | - |
n/a
|
| WM0263 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,080 | $3,550 |
n/a
|
| WM0255 #05 Y:2025 | 05 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $1,026 | $2,200 |