25
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Other paperboard container manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0218 #06 Y:2023 | 06 | 2023 | Install set-back timers | $473 | $1,000 | |
| DL0218 #05 Y:2023 | 05 | 2023 | Recover waste heat from equipment | $11,159 | $10,000 | |
| DL0218 #04 Y:2023 | 04 | 2023 | Shut off cooling if cold outside air will cool process | $10,992 | $10,000 | |
| DL0218 #03 Y:2023 | 03 | 2023 | Re-use or recycle hot or cold process exhaust air | $3,402 | $750 | |
| DL0218 #02 Y:2023 | 02 | 2023 | Utilize controls to operate equipment only when needed | $90,882 | - | |
| DL0218 #01 Y:2023 | 01 | 2023 | Reduce ventilation air | $11,809 | - | |
| DL0150 #08 Y:2015 | 08 | 2015 | Convert combustion equipment to burn natural gas | $7,020 | $58,500 | |
| DL0150 #07 Y:2015 | 07 | 2015 | Utilize higher efficiency lamps and/or ballasts | $3,720 | $18,100 | |
| DL0150 #06 Y:2015 | 06 | 2015 | Lower ceiling to reduce conditioned space | $13,240 | $62,400 | |
| DL0150 #05 Y:2015 | 05 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $6,075 | $19,740 | |
| DL0150 #04 Y:2015 | 04 | 2015 | Install replacement doors | $2,450 | $7,800 | |
| DL0150 #03 Y:2015 | 03 | 2015 | Reduce illumination to minimum necessary levels | $760 | $560 | |
| DL0150 #02 Y:2015 | 02 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,920 | $500 | |
| DL0150 #01 Y:2015 | 01 | 2015 | Make a practice of turning off lights when not needed | $780 | - | |
| LE0229 #11 Y:2005 | 11 | 2005 | Utilize higher efficiency lamps and/or ballasts | $3,100 | $4,218 | |
| LE0229 #10 Y:2005 | 10 | 2005 | Install occupancy sensors | $5,318 | $525 | |
| LE0229 #09 Y:2005 | 09 | 2005 | Install compressor air intakes in coolest locations | $1,780 | $1,000 | |
| LE0229 #08 Y:2005 | 08 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $2,528 | $2,500 | |
| LE0229 #07 Y:2005 | 07 | 2005 | Use / purchase optimum sized compressor | $2,542 | $2,100 | |
| LE0229 #06 Y:2005 | 06 | 2005 | Shift from daytime to nighttime operation | $6,898 | $316 |