ITAC Assessment: LE0229
ITAC logo
ITAC Assessment: LE0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Folding cartons
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2652: Setup Paperboard Boxes
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 168,600
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,710 3,048,736
kWh
Electricity Demand $51,395 8,398
kW-mo/yr
Natural Gas $223,639 43,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $227,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.5194: Redesign process $80,430 $30,000 - - $80,430
-
MMBtu
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $64,670 $27,200 - - $64,670
-
MMBtu
-
03 3.5121: Recycle waste ink and cleanup solvent $36,000 $50,000 - - - $36,000
-
gal
04 2.4112: Install soft-start to eliminate nuisance trips $16,904 $34,000 - $16,904
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,981 $500 $6,103
74,420
kWh
$878
-
kW-mo/yr
- -
06 2.3134: Shift from daytime to nighttime operation $6,898 $316 - $6,898
-
kW-mo/yr
- -
07 2.4226: Use / purchase optimum sized compressor $2,542 $2,100 $2,307
28,135
kWh
$235
-
kW-mo/yr
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,528 $2,500 - $2,528
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $1,780 $1,000 $1,497
18,254
kWh
$283
-
kW-mo/yr
- -
10 2.7135: Install occupancy sensors $5,318 $525 $5,318
64,876
kWh
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $3,100 $4,218 $2,710
33,048
kWh
$390
-
kW-mo/yr
- -
TOTAL RECOMMENDED $227,151 $152,359 $17,935
218,733
kWh
$28,116
-
kW-mo/yr
$145,100
-
MMBtu
$36,000
-
gal
TOTAL IMPLEMENTED $126,335 $112,700 $7,600
92,674
kWh
$18,065
-
kW-mo/yr
$64,670
-
MMBtu
$36,000
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs