Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other paperboard container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0406 #02 Y:2008 Use cooling tower or economizer to replace chiller cooling $9,257 $1,026
SD0406 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $12,805 $48,176
MI0138 #08 Y:2006 Eliminate or reduce compressed air usage $2,463 $142
MI0138 #07 Y:2006 Utilize energy-efficient belts and other improved mechanisms $3,808 $713
MI0138 #06 Y:2006 Use optimum size and capacity equipment $4,001 $9,540
MI0138 #05 Y:2006 Install vinyl strip / high speed / air curtain doors $18,750 $4,708
MI0138 #04 Y:2006 Reduce the pressure of compressed air to the minimum required $19,522 $30
MI0138 #03 Y:2006 Utilize higher efficiency lamps and/or ballasts $22,551 $54,600
MI0138 #02 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $28,014 $20,014
MI0138 #01 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $38,928 $1,074
CO0590 #12 Y:2006 Utilize higher efficiency lamps and/or ballasts $160 $500
CO0590 #11 Y:2006 Install occupancy sensors $210 $780
CO0590 #10 Y:2006 Install occupancy sensors $1,280 $680
CO0590 #09 Y:2006 Use solar heat to make electricty $3,850 $32,600
CO0590 #08 Y:2006 Utilize higher efficiency lamps and/or ballasts $28,940 $70,090
CO0590 #07 Y:2006 Eliminate leaks in combustible gas lines $560 $500
CO0590 #06 Y:2006 Utilize energy-efficient belts and other improved mechanisms $670 $1,390
CO0590 #05 Y:2006 Eliminate or reduce compressed air usage $1,880 -
CO0590 #04 Y:2006 Use most efficient type of electric motors $560 $658
CO0590 #03 Y:2006 Install compressor air intakes in coolest locations $2,660 $100