ITAC Assessment: MI0138
ITAC logo
ITAC Assessment: MI0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fiber Cans
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $50
M
to 100
M
# of Employees 99
Plant Area 200,000
ft2
Annual Production 1,350,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $531,564 7,156,200
kWh
Electricity Demand $56,490 16,374
kW-mo/yr
Electricity Fees $49,699 -
Natural Gas $278,725 28,863
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $38,928 $1,074 $35,880
447,156
kWh
$3,048
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,014 $20,014 $28,014
349,128
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $22,551 $54,600 $20,829
259,584
kWh
$1,722
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $19,522 $30 $18,193
226,733
kWh
$1,329
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $18,750 $4,708 - - $18,750
-
MMBtu
06 2.4323: Use optimum size and capacity equipment $4,001 $9,540 $3,656
45,569
kWh
$345
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,808 $713 $3,793
47
kWh
$15
-
kW-mo/yr
-
08 2.4239: Eliminate or reduce compressed air usage $2,463 $142 $2,329
25,901
kWh
$134
-
kW-mo/yr
-
TOTAL RECOMMENDED $138,037 $90,821 $112,694
1,354,118
kWh
$6,593
-
kW-mo/yr
$18,750
-
MMBtu
TOTAL IMPLEMENTED $38,928 $1,074 $35,880
447,156
kWh
$3,048
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs