ITAC Assessment: MA0579
ITAC logo
ITAC Assessment: MA0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Injection molding Equipment and molds
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 72,000
ft2
Annual Production 270
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,210 2,409,283
kWh
Electricity Demand $31,471 4,412
kW-mo/yr
Electricity Fees $1,494 -
Natural Gas $113,828 9,262
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,816 $7,000 $1,884
19,628
kWh
- $6,932
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,934 $4,500 $9,183
84,090
kWh
- $(-4,249.0)
-
MMBtu
03 2.3212: Optimize plant power factor $3,785 $350 $3,785
39,426
kWh
- -
04 2.7224: Reduce space conditioning during non-working hours $3,893 $4,197 - - $3,893
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,427 $7,389 $3,427
35,700
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,484 $450 $2,484
25,878
kWh
- -
07 2.2614: Use cooling tower or economizer to replace chiller cooling $2,309 $9,650 $1,767
18,405
kWh
$542
-
kW-mo/yr
-
08 2.2511: Insulate bare equipment $647 $1,170 - - $647
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $20,755 $64,891 $18,790
195,730
kWh
$1,965
-
kW-mo/yr
-
TOTAL RECOMMENDED $51,050 $99,597 $41,320
418,857
kWh
$2,507
-
kW-mo/yr
$7,223
-
MMBtu
TOTAL IMPLEMENTED $19,267 $20,206 $7,795
81,206
kWh
- $11,472
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs