Assessment Year | 2005 |
---|---|
Principal Product | Injection molding Equipment and molds |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 215 |
Plant Area |
72,000
ft2
|
Annual Production | 270
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $209,210 | 2,409,283 |
kWh
|
$0.087 |
Electricity Demand | $31,471 | 4,412 |
kW-mo/yr
|
$7.13 |
Electricity Fees | $1,494 | - |
|
- |
Natural Gas | $113,828 | 9,262 |
MMBtu
|
$12.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,267 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,816 | $7,000 |
$1,884
19,628
kWh
|
- |
$6,932
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,934 | $4,500 |
$9,183
84,090
kWh
|
- |
$(-4,249.0)
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $3,785 | $350 |
$3,785
39,426
kWh
|
- | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $3,893 | $4,197 | - | - |
$3,893
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,427 | $7,389 |
$3,427
35,700
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,484 | $450 |
$2,484
25,878
kWh
|
- | - | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,309 | $9,650 |
$1,767
18,405
kWh
|
$542
-
kW-mo/yr
|
- | |
08 | 2.2511: Insulate bare equipment | $647 | $1,170 | - | - |
$647
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,755 | $64,891 |
$18,790
195,730
kWh
|
$1,965
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $51,050 | $99,597 |
$41,320
418,857
kWh
|
$2,507
-
kW-mo/yr
|
$7,223
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,267 | $20,206 |
$7,795
81,206
kWh
|
- |
$11,472
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs