| Assessment Year | 2005 |
|---|---|
| Principal Product | Injection molding Equipment and molds |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 215 |
| Plant Area |
72,000
ft2
|
| Annual Production | 270
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $209,210 | 2,409,283 |
kWh
|
$0.087 |
| Electricity Demand | $31,471 | 4,412 |
kW-mo/yr
|
$7.13 |
| Electricity Fees | $1,494 | - |
|
- |
| Natural Gas | $113,828 | 9,262 |
MMBtu
|
$12.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,267 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,816 | $7,000 |
$1,884
19,628
kWh
|
- |
$6,932
-
MMBtu
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,934 | $4,500 |
$9,183
84,090
kWh
|
- |
$(-4,249.0)
-
MMBtu
|
|
| 03 | 2.3212: Optimize plant power factor | $3,785 | $350 |
$3,785
39,426
kWh
|
- | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $3,893 | $4,197 | - | - |
$3,893
-
MMBtu
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,427 | $7,389 |
$3,427
35,700
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,484 | $450 |
$2,484
25,878
kWh
|
- | - | |
| 07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,309 | $9,650 |
$1,767
18,405
kWh
|
$542
-
kW-mo/yr
|
- | |
| 08 | 2.2511: Insulate bare equipment | $647 | $1,170 | - | - |
$647
-
MMBtu
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,755 | $64,891 |
$18,790
195,730
kWh
|
$1,965
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $51,050 | $99,597 |
$41,320
418,857
kWh
|
$2,507
-
kW-mo/yr
|
$7,223
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $19,267 | $20,206 |
$7,795
81,206
kWh
|
- |
$11,472
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs