ITAC Assessment: SD0406
ITAC logo
ITAC Assessment: SD0406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Fiber and Plastic Drums
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 75,000
ft2
Annual Production 750,000,000
pieces
Production Hrs. Annual 6,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,147 1,635,579
kWh
Electricity Demand $90,117 5,488
kW-mo/yr
Electricity Fees $14,973 -
Natural Gas $2,948 228
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,525 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,805 $48,176 $9,193
101,024
kWh
$3,612
-
kW-mo/yr
02 2.2614: Use cooling tower or economizer to replace chiller cooling $9,257 $1,026 $5,514
59,871
kWh
$3,743
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,830 $3,110 $1,403
15,380
kWh
$427
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,339 $6,365 $2,339
25,643
kWh
-
05 2.4133: Use most efficient type of electric motors $2,294 $1,477 $1,374
15,100
kWh
$920
-
kW-mo/yr
TOTAL RECOMMENDED $28,525 $60,154 $19,823
217,018
kWh
$8,702
-
kW-mo/yr
TOTAL IMPLEMENTED $19,268 $59,128 $14,309
157,147
kWh
$4,959
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs