Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

370

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Folding paperboard box manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0603 #11 Y:2026 Insulate bare equipment $24 $131
SU0603 #10 Y:2026 Conserve energy by efficient use of vending machines $175 $940
SU0603 #09 Y:2026 Use heat pump for space conditioning $13,288 $69,984
SU0603 #08 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $72 $197
SU0603 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $4,105 $8,471
SU0603 #06 Y:2026 Install set-back timers $5,316 $460
SU0603 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $407 -
SU0603 #04 Y:2026 Eliminate/reduce an operation $716 -
SU0603 #03 Y:2026 Install spectral reflectors / delamp $1,066 -
SU0603 #02 Y:2026 Apply for tax-free status for energy purchases $10,378 -
SU0603 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $6,912 -
IC0345 #11 Y:2026 Install / repair insulation on steam lines $11,178 $2,752
IC0345 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,798 $1,775
IC0345 #09 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $6,608 $10,990
IC0345 #08 Y:2026 Eliminate or reduce compressed air usage $709 $2,496
IC0345 #07 Y:2026 Use demand controller or load shedder $819 $1,912
IC0345 #06 Y:2026 Use heat from boiler blowdown to preheat boiler feed water $6,218 $10,544
IC0345 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,677 $720
IC0345 #04 Y:2026 Turn off equipment when not in use $18,089 $6,484
IC0345 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $6,117 $5,000