1,000
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Corrugated and solid fiber box manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0612 #06 Y:2026 | 06 | 2026 | Install occupancy sensors | $207 | $585 |
n/a
|
| AS0612 #05 Y:2026 | 05 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $1,245 | $20,000 |
n/a
|
| AS0612 #04 Y:2026 | 04 | 2026 | Install timers on light switches in little used areas | $3,058 | $1,600 |
n/a
|
| AS0612 #03 Y:2026 | 03 | 2026 | Pay utility bills on time | $39,461 | $10,785 |
n/a
|
| AS0612 #02 Y:2026 | 02 | 2026 | Add air shields to trucks to increase fuel mileage | $61,388 | $58,430 |
n/a
|
| AS0612 #01 Y:2026 | 01 | 2026 | Upgrade obsolete equipment | $315,000 | $813,776 |
n/a
|
| NL0110 #05 Y:2025 | 05 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $527 | $700 |
n/a
|
| NL0110 #04 Y:2025 | 04 | 2025 | Meter waste water | $4,494 | $2,400 |
n/a
|
| NL0110 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,063 | $4,500 |
n/a
|
| NL0110 #02 Y:2025 | 02 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $7,360 | $160 |
n/a
|
| NL0110 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $262,812 | $4,671,994 |
n/a
|
| SD0663 #11 Y:2024 | 11 | 2024 | Replace existing hvac unit with high efficiency model | $10,593 | $35,000 | |
| SD0663 #10 Y:2024 | 10 | 2024 | Install compressor air intakes in coolest locations | $6,427 | $3,278 | |
| SD0663 #09 Y:2024 | 09 | 2024 | Eliminate or reduce compressed air usage | $3,465 | $3,200 | |
| SD0663 #08 Y:2024 | 08 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,107 | $2,287 | |
| SD0663 #07 Y:2024 | 07 | 2024 | Reduce the pressure of compressed air to the minimum required | $6,623 | $500 | |
| SD0663 #06 Y:2024 | 06 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $12,191 | - | |
| SD0663 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $33,214 | $18,590 | |
| SD0663 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $8,102 | $3,252 | |
| SD0663 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $11,060 | $4,266 |