2,410
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MI0114 #08 Y:2005 | 08 | 2005 | Upgrade controls on compressors | $3,882 | - | |
| MI0114 #07 Y:2005 | 07 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,896 | $1,074 | |
| MI0114 #06 Y:2005 | 06 | 2005 | Turn off equipment when not in use | $9,392 | $77 | |
| MI0114 #05 Y:2005 | 05 | 2005 | Meter recycled water (to reduce sewer charges) | $9,790 | $4,360 | |
| MI0114 #04 Y:2005 | 04 | 2005 | Insulate bare equipment | $2,983 | $225 | |
| MI0114 #03 Y:2005 | 03 | 2005 | Use waste heat from hot flue gases to preheat | $28,927 | $27,000 | |
| MI0114 #02 Y:2005 | 02 | 2005 | Improve combustion control capability | $20,574 | $30,050 | |
| MI0114 #01 Y:2005 | 01 | 2005 | Insulate bare equipment | $28,126 | $1,091 | |
| WI0494 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $207 | $640 | |
| WI0494 #05 Y:2005 | 05 | 2005 | Recover waste heat from equipment | $1,037 | $1,000 | |
| WI0494 #04 Y:2005 | 04 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $4,060 | $6,060 | |
| WI0494 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $5,231 | $12,960 | |
| WI0494 #02 Y:2005 | 02 | 2005 | Distill contaminated solvents for reuse | $12,456 | $16,500 | |
| WI0494 #01 Y:2005 | 01 | 2005 | Use optimum size and capacity equipment | $3,360 | $11,500 | |
| LE0213 #08 Y:2005 | 08 | 2005 | Utilize higher efficiency lamps and/or ballasts | $8,210 | $53,880 | |
| LE0213 #07 Y:2005 | 07 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,384 | $200 | |
| LE0213 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $4,694 | $2,000 | |
| LE0213 #05 Y:2005 | 05 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $4,792 | $1,000 | |
| LE0213 #04 Y:2005 | 04 | 2005 | Shift from daytime to nighttime operation | $5,279 | $368 | |
| LE0213 #03 Y:2005 | 03 | 2005 | Change rate schedules or other changes in utility service | $9,703 | $25,000 |