| Assessment Year | 2005 |
|---|---|
| Principal Product | Printing labels |
| NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
| SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 70 |
| Plant Area |
65,600
ft2
|
| Annual Production | 36,000
thousand feet
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $96,304 | 3,475,393 |
kWh
|
$0.028 |
| Electricity Demand | $86,384 | 9,066 |
kW-mo/yr
|
$9.53 |
| Natural Gas | $19,519 | 2,364 |
MMBtu
|
$8.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,351 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,231 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $3,360 | $11,500 |
$658
22,380
kWh
|
$2,702
-
kW-mo/yr
|
- | - | |
| 02 | 3.8142: Distill contaminated solvents for reuse | $12,456 | $16,500 | - | - | - |
$12,456
-
gal
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,231 | $12,960 |
$3,101
105,840
kWh
|
$2,130
-
kW-mo/yr
|
- | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,060 | $6,060 |
$2,544
86,820
kWh
|
$1,516
-
kW-mo/yr
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $1,037 | $1,000 | - | - |
$1,037
-
MMBtu
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $207 | $640 |
$117
4,004
kWh
|
$90
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $26,351 | $48,660 |
$6,420
219,044
kWh
|
$6,438
-
kW-mo/yr
|
$1,037
-
MMBtu
|
$12,456
-
gal
|
||
| TOTAL IMPLEMENTED | $5,231 | $12,960 |
$3,101
105,840
kWh
|
$2,130
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs