Assessment Year | 2005 |
---|---|
Principal Product | Corrugated Cardboard |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
144,000
ft2
|
Annual Production | 75,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $234,132 | 4,632,240 |
kWh
|
$0.051 |
Electricity Demand | $87,779 | 10,658 |
kW-mo/yr
|
$8.24 |
Electricity Fees | $41,908 | - |
|
- |
Natural Gas | $456,777 | 64,398 |
MMBtu
|
$7.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $118,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,517 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $28,126 | $1,091 | - | - |
$28,126
-
MMBtu
|
- | |
02 | 2.1116: Improve combustion control capability | $20,574 | $30,050 | - | - |
$20,574
-
MMBtu
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $28,927 | $27,000 | - | - |
$28,927
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $2,983 | $225 | - | - |
$2,983
-
MMBtu
|
- | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $9,790 | $4,360 | - | - | - | $9,790 | |
06 | 2.6218: Turn off equipment when not in use | $9,392 | $77 |
$9,392
174,564
kWh
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,896 | $1,074 |
$9,022
167,670
kWh
|
$1,874
-
kW-mo/yr
|
- | - | |
08 | 2.4224: Upgrade controls on compressors | $3,882 | - |
$2,667
49,555
kWh
|
$1,215
-
kW-mo/yr
|
- | - | |
09 | 2.4323: Use optimum size and capacity equipment | $3,521 | $4,628 |
$2,892
53,741
kWh
|
$629
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $118,091 | $68,505 |
$23,973
445,530
kWh
|
$3,718
-
kW-mo/yr
|
$80,610
-
MMBtu
|
$9,790 | ||
TOTAL IMPLEMENTED | $57,517 | $35,786 |
$21,081
391,789
kWh
|
$3,089
-
kW-mo/yr
|
$23,557
-
MMBtu
|
$9,790 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs