ITAC Assessment: MI0114
ITAC logo
ITAC Assessment: MI0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Corrugated Cardboard
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 144,000
ft2
Annual Production 75,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,132 4,632,240
kWh
Electricity Demand $87,779 10,658
kW-mo/yr
Electricity Fees $41,908 -
Natural Gas $456,777 64,398
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $28,126 $1,091 - - $28,126
-
MMBtu
-
02 2.1116: Improve combustion control capability $20,574 $30,050 - - $20,574
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $28,927 $27,000 - - $28,927
-
MMBtu
-
04 2.2511: Insulate bare equipment $2,983 $225 - - $2,983
-
MMBtu
-
05 3.4116: Meter recycled water (to reduce sewer charges) $9,790 $4,360 - - - $9,790
06 2.6218: Turn off equipment when not in use $9,392 $77 $9,392
174,564
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,896 $1,074 $9,022
167,670
kWh
$1,874
-
kW-mo/yr
- -
08 2.4224: Upgrade controls on compressors $3,882 - $2,667
49,555
kWh
$1,215
-
kW-mo/yr
- -
09 2.4323: Use optimum size and capacity equipment $3,521 $4,628 $2,892
53,741
kWh
$629
-
kW-mo/yr
- -
TOTAL RECOMMENDED $118,091 $68,505 $23,973
445,530
kWh
$3,718
-
kW-mo/yr
$80,610
-
MMBtu
$9,790
TOTAL IMPLEMENTED $57,517 $35,786 $21,081
391,789
kWh
$3,089
-
kW-mo/yr
$23,557
-
MMBtu
$9,790
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs