Assessment Year | 2005 |
---|---|
Principal Product | Envelopes |
NAICS | 322230: Stationery Product Manufacturing |
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
118,000
ft2
|
Annual Production | 5
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $401,851 | 10,452,883 |
kWh
|
$0.038 |
Electricity Demand | $169,665 | 17,269 |
kW-mo/yr
|
$9.82 |
Fuel Oil #2 | $35,000 | 2,970 |
MMBtu
|
$11.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $68,438 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $24,825 | $1,344 |
$24,825
653,290
kWh
|
- | |
02 | 2.6218: Turn off equipment when not in use | $22,533 | $6,000 |
$22,533
592,984
kWh
|
- | |
03 | 2.8114: Change rate schedules or other changes in utility service | $9,703 | $25,000 |
$9,703
-
kWh
|
- | |
04 | 2.3134: Shift from daytime to nighttime operation | $5,279 | $368 | - |
$5,279
-
kW-mo/yr
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,792 | $1,000 |
$3,536
93,064
kWh
|
$1,256
-
kW-mo/yr
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $4,694 | $2,000 |
$3,308
87,054
kWh
|
$1,386
-
kW-mo/yr
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,384 | $200 |
$2,497
65,715
kWh
|
$887
-
kW-mo/yr
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,210 | $53,880 |
$5,261
138,450
kWh
|
$2,949
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $83,420 | $89,792 |
$71,663
1,630,557
kWh
|
$11,757
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $68,438 | $64,424 |
$61,960
1,630,557
kWh
|
$6,478
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs