Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,410

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0816 #05 Y:2005 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $31,493 $25,500
GT0816 #04 Y:2005 Utilize energy-efficient belts and other improved mechanisms $7,351 $5,122
GT0816 #03 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,196 $1,422
GT0816 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $7,467 $7,195
GT0816 #01 Y:2005 Increase amount of condensate returned $15,818 $4,500
SF0320 #06 Y:2005 Change rate schedules or other changes in utility service $6,670 $30,700
SF0320 #05 Y:2005 Optimize plant power factor $1,799 $3,725
SF0320 #04 Y:2005 Install occupancy sensors $880 $1,320
SF0320 #03 Y:2005 Use most efficient type of electric motors $1,797 $2,531
SF0320 #02 Y:2005 Eliminate or reduce compressed air usage $4,706 $5,690
SF0320 #01 Y:2005 Utilize energy-efficient belts and other improved mechanisms $528 $488
LE0227 #07 Y:2005 Install vinyl strip / high speed / air curtain doors $2,617 $1,200
LE0227 #06 Y:2005 Utilize energy-efficient belts and other improved mechanisms $5,005 $500
LE0227 #05 Y:2005 Install back-up equipment $8,000 $7,900
LE0227 #04 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $15,727 $1,000
LE0227 #03 Y:2005 Install soft-start to eliminate nuisance trips $18,895 $42,000
LE0227 #02 Y:2005 Replace boiler $39,147 $143,000
LE0227 #01 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $101,579 $40,000
UU0097 #09 Y:2005 Use most efficient type of electric motors $71,588 $180,000
UU0097 #08 Y:2005 Reduce the pressure of compressed air to the minimum required $2,113 $3,570