ITAC Assessment: LE0227
ITAC logo
ITAC Assessment: LE0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product folding cartons
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range less than $500
k
# of Employees 77
Plant Area 102,000
ft2
Annual Production 10,358,815
units
Production Hrs. Annual 4,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,168 1,539,600
kWh
Electricity Demand $40,274 6,690
kW-mo/yr
Natural Gas $55,767 4,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $190,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $101,579 $40,000 $86,910
812,246
kWh
$14,669
-
kW-mo/yr
- -
02 2.1224: Replace boiler $39,147 $143,000 - - $39,147
-
MMBtu
-
03 2.4112: Install soft-start to eliminate nuisance trips $18,895 $42,000 - $18,895
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,727 $1,000 $13,457
125,726
kWh
$2,270
-
kW-mo/yr
- -
05 4.651: Install back-up equipment $8,000 $7,900 - - - $8,000
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,005 $500 $4,415
41,271
kWh
$590
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,617 $1,200 - - $2,617
-
MMBtu
-
TOTAL RECOMMENDED $190,970 $235,600 $104,782
979,243
kWh
$36,424
-
kW-mo/yr
$41,764
-
MMBtu
$8,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs