Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,410

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0229 #08 Y:2005 Reschedule plant operations or reduce load to avoid peaks $2,528 $2,500
LE0229 #07 Y:2005 Use / purchase optimum sized compressor $2,542 $2,100
LE0229 #06 Y:2005 Shift from daytime to nighttime operation $6,898 $316
LE0229 #05 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $6,981 $500
LE0229 #04 Y:2005 Install soft-start to eliminate nuisance trips $16,904 $34,000
LE0229 #03 Y:2005 Recycle waste ink and cleanup solvent $36,000 $50,000
LE0229 #02 Y:2005 Replace fossil fuel equipment with electrical equipment $64,670 $27,200
LE0229 #01 Y:2005 Redesign process $80,430 $30,000
OK0721 #06 Y:2005 Recharge batteries on during off-peak demand periods $323 -
OK0721 #05 Y:2005 Install occupancy sensors $289 $1,373
OK0721 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,837 $13,148
OK0721 #03 Y:2005 Recover waste heat from equipment $5,586 $31,632
OK0721 #02 Y:2005 Reduce the pressure of compressed air to the minimum required $17,540 $7,400
OK0721 #01 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $486 $415
IA0382 #22 Y:2005 Reduce defects by reducing product tipping $14,500 $18,000
IA0382 #21 Y:2005 Turn off equipment when not in use $5,293 $1,000
IA0382 #20 Y:2005 Use most efficient type of electric motors $268 $303
IA0382 #19 Y:2005 Utilize energy-efficient belts and other improved mechanisms $1,614 $1,590
IA0382 #18 Y:2005 Replace water cooling on processes with air cooling $9,899 $3,000
IA0382 #17 Y:2005 Recover waste heat from equipment $44,129 $95,000