ITAC Assessment: OK0721
ITAC logo
ITAC Assessment: OK0721
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Envelopes
NAICS 322230: Stationery Product Manufacturing
SIC 2677: Envelopes
Sales Range $50
M
to 100
M
# of Employees 306
Plant Area 250,000
ft2
Annual Production 3,000,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $469,790 14,434,350
kWh
Electricity Demand $286,298 30,540
kW-mo/yr
Natural Gas $66,980 6,918
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $486 $415 $486
16,422
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $17,540 $7,400 $1,278
39,338
kWh
- $16,262
-
MMBtu
03 2.2437: Recover waste heat from equipment $5,586 $31,632 - - $5,586
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,837 $13,148 $1,193
36,703
kWh
$644
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $289 $1,373 $289
8,852
kWh
- -
06 2.3132: Recharge batteries on during off-peak demand periods $323 - - $323
-
kW-mo/yr
-
TOTAL RECOMMENDED $26,061 $53,968 $3,246
101,315
kWh
$967
-
kW-mo/yr
$21,848
-
MMBtu
TOTAL IMPLEMENTED $7,909 $45,195 $1,679
53,125
kWh
$644
-
kW-mo/yr
$5,586
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs