ITAC Assessment: SD0428
ITAC logo
ITAC Assessment: SD0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product treated waste water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 308
Plant Area 871,200
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,411,613 16,961,296
kWh
Natural Gas $170,699 31,568
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,812 $400 $4,812
57,800
kWh
02 2.7135: Install occupancy sensors $900 $49 $900
10,825
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,585 $11,320 $9,585
115,201
kWh
04 3.2176: Increase use of automation $3,390 $6,200 $3,390
40,758
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,796 $15,635 $6,796
81,687
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $265 $777 $265
3,180
kWh
TOTAL RECOMMENDED $25,748 $34,381 $25,748
309,451
kWh
TOTAL IMPLEMENTED $4,812 $400 $4,812
57,800
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs