| Assessment Year | 2010 |
|---|---|
| Principal Product | treated waste water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $10 M to 50M |
| # of Employees | 308 |
| Plant Area |
871,200
ft2
|
| Annual Production | 30,000,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,411,613 | 16,961,296 |
kWh
|
$0.083 |
| Natural Gas | $170,699 | 31,568 |
MMBtu
|
$5.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,748 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,812 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,812 | $400 |
$4,812
57,800
kWh
|
|
| 02 | 2.7135: Install occupancy sensors | $900 | $49 |
$900
10,825
kWh
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,585 | $11,320 |
$9,585
115,201
kWh
|
|
| 04 | 3.2176: Increase use of automation | $3,390 | $6,200 |
$3,390
40,758
kWh
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,796 | $15,635 |
$6,796
81,687
kWh
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $265 | $777 |
$265
3,180
kWh
|
|
| TOTAL RECOMMENDED | $25,748 | $34,381 |
$25,748
309,451
kWh
|
||
| TOTAL IMPLEMENTED | $4,812 | $400 |
$4,812
57,800
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs