2,435
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0326 #06 Y:2006 | 06 | 2006 | Utilize higher efficiency lamps and/or ballasts | $51,157 | $38,849 | |
| SF0326 #05 Y:2006 | 05 | 2006 | Utilize daylight whenever possible in lieu of artificial light | $28,919 | $17,664 | |
| SF0326 #04 Y:2006 | 04 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $19,076 | $12,276 | |
| SF0326 #03 Y:2006 | 03 | 2006 | Remove or close off unneeded compressed air lines | $18,476 | $5,600 | |
| SF0326 #02 Y:2006 | 02 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,158 | - | |
| SF0326 #01 Y:2006 | 01 | 2006 | Remove or close off unneeded compressed air lines | $29,674 | - | |
| MA0602 #08 Y:2006 | 08 | 2006 | Insulate bare equipment | $1,122 | $950 | |
| MA0602 #07 Y:2006 | 07 | 2006 | Optimize plant power factor | $1,918 | $700 | |
| MA0602 #06 Y:2006 | 06 | 2006 | Utilize controls to operate equipment only when needed | $7,526 | $8,755 | |
| MA0602 #05 Y:2006 | 05 | 2006 | Insulate bare equipment | $8,388 | $4,050 | |
| MA0602 #04 Y:2006 | 04 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,691 | $749 | |
| MA0602 #03 Y:2006 | 03 | 2006 | Utilize higher efficiency lamps and/or ballasts | $19,335 | $96,992 | |
| MA0602 #02 Y:2006 | 02 | 2006 | Use minimum safe oven ventilation | $71,115 | $115,075 | |
| MA0602 #01 Y:2006 | 01 | 2006 | Recover waste heat from equipment | $79,413 | $172,300 | |
| UU0099 #07 Y:2006 | 07 | 2006 | Optimize plant power factor | $8,020 | $14,000 | |
| UU0099 #06 Y:2006 | 06 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,230 | $2,510 | |
| UU0099 #05 Y:2006 | 05 | 2006 | Use waste heat from hot flue gases to preheat | $7,100 | $21,000 | |
| UU0099 #04 Y:2006 | 04 | 2006 | Use demand controller or load shedder | $15,029 | $7,500 | |
| UU0099 #03 Y:2006 | 03 | 2006 | Recycle air for heating, ventilation and air conditioning | $36,960 | $164,490 | |
| UU0099 #02 Y:2006 | 02 | 2006 | Isolate hot or cold equipment | $1,350 | - |