| Assessment Year | 2006 |
|---|---|
| Principal Product | Cardboard box |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
385,526
ft2
|
| Annual Production | 1,140,371
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $239,565 | 8,111,235 |
kWh
|
$0.030 |
| Electricity Demand | $64,638 | 18,000 |
kW-mo/yr
|
$3.59 |
| Natural Gas | $528,148 | 78,314 |
MMBtu
|
$6.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,880 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $3,650 | - |
$2,340
79,060
kWh
|
$1,310
-
kW-mo/yr
|
- | |
| 02 | 2.2522: Isolate hot or cold equipment | $1,350 | - | - | - |
$1,350
-
MMBtu
|
|
| 03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $36,960 | $164,490 | - | - |
$36,960
-
MMBtu
|
|
| 04 | 2.3191: Use demand controller or load shedder | $15,029 | $7,500 | - |
$15,029
-
kW-mo/yr
|
- | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $7,100 | $21,000 | - | - |
$7,100
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,230 | $2,510 |
$2,720
92,170
kWh
|
$510
-
kW-mo/yr
|
- | |
| 07 | 2.3212: Optimize plant power factor | $8,020 | $14,000 | - |
$8,020
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $75,339 | $209,500 |
$5,060
171,230
kWh
|
$24,869
-
kW-mo/yr
|
$45,410
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,880 | $2,510 |
$5,060
171,230
kWh
|
$1,820
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs