ITAC Assessment: UU0099
ITAC logo
ITAC Assessment: UU0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Cardboard box
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 385,526
ft2
Annual Production 1,140,371
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,565 8,111,235
kWh
Electricity Demand $64,638 18,000
kW-mo/yr
Natural Gas $528,148 78,314
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $3,650 - $2,340
79,060
kWh
$1,310
-
kW-mo/yr
-
02 2.2522: Isolate hot or cold equipment $1,350 - - - $1,350
-
MMBtu
03 2.7313: Recycle air for heating, ventilation and air conditioning $36,960 $164,490 - - $36,960
-
MMBtu
04 2.3191: Use demand controller or load shedder $15,029 $7,500 - $15,029
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $7,100 $21,000 - - $7,100
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,230 $2,510 $2,720
92,170
kWh
$510
-
kW-mo/yr
-
07 2.3212: Optimize plant power factor $8,020 $14,000 - $8,020
-
kW-mo/yr
-
TOTAL RECOMMENDED $75,339 $209,500 $5,060
171,230
kWh
$24,869
-
kW-mo/yr
$45,410
-
MMBtu
TOTAL IMPLEMENTED $6,880 $2,510 $5,060
171,230
kWh
$1,820
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs