Assessment Year | 2006 |
---|---|
Principal Product | Cardboard box |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
385,526
ft2
|
Annual Production | 1,140,371
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $239,565 | 8,111,235 |
kWh
|
$0.030 |
Electricity Demand | $64,638 | 18,000 |
kW-mo/yr
|
$3.59 |
Natural Gas | $528,148 | 78,314 |
MMBtu
|
$6.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,880 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $3,650 | - |
$2,340
79,060
kWh
|
$1,310
-
kW-mo/yr
|
- | |
02 | 2.2522: Isolate hot or cold equipment | $1,350 | - | - | - |
$1,350
-
MMBtu
|
|
03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $36,960 | $164,490 | - | - |
$36,960
-
MMBtu
|
|
04 | 2.3191: Use demand controller or load shedder | $15,029 | $7,500 | - |
$15,029
-
kW-mo/yr
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $7,100 | $21,000 | - | - |
$7,100
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,230 | $2,510 |
$2,720
92,170
kWh
|
$510
-
kW-mo/yr
|
- | |
07 | 2.3212: Optimize plant power factor | $8,020 | $14,000 | - |
$8,020
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $75,339 | $209,500 |
$5,060
171,230
kWh
|
$24,869
-
kW-mo/yr
|
$45,410
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,880 | $2,510 |
$5,060
171,230
kWh
|
$1,820
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs