Assessment Year | 1997 |
---|---|
Principal Product | electro-pneumatic controls |
NAICS |
n/a
|
SIC | 3743: Railroad Equipment |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
437,000
ft2
|
Annual Production | 5,600,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $177,716 | 10,531,360 |
kWh
|
$0.017 |
Electricity Demand | $203,705 | 22,484 |
kW-mo/yr
|
$9.06 |
Electricity Fees | $57,357 | - |
|
- |
Natural Gas | $112,412 | 26,818 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,002,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,428 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,752 | $690 |
$671
39,859
kWh
|
$1,081
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $803 | $249 |
$307
18,171
kWh
|
$496
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,932 | $2,000 |
$758
44,842
kWh
|
$1,174
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7314: Reduce ventilation air | $3,671 | $12,046 | - | - |
$3,671
-
MMBtu
|
- | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $27,676 | - |
$1,107
65,651
kWh
|
$3,569
-
kW-mo/yr
|
- | - | $23,000 | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,960 | $606 |
$465
27,550
kWh
|
$1,495
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $680 | $500 | - | - | - |
$680
-
gal
|
- | - | |
08 | 3.3128: Utilize other methods to remove contaminants | $8,290 | - |
$300
17,878
kWh
|
$190
-
kW-mo/yr
|
- | - | $7,800 | - | |
09 | 4.112: Replace old machine with new automatic multi-station tool | $942,500 | $1,200,000 | - | - | - | - | - | $942,500 | |
10 | 4.651: Install back-up equipment | $13,406 | $21,000 | - | - | - | - | $13,406 | - | |
TOTAL RECOMMENDED | $1,002,670 | $1,237,091 |
$3,608
213,951
kWh
|
$8,005
-
kW-mo/yr
|
$3,671
-
MMBtu
|
$680
-
gal
|
$44,206 | $942,500 | ||
TOTAL IMPLEMENTED | $29,428 | $690 |
$1,778
105,510
kWh
|
$4,650
-
kW-mo/yr
|
- | - | $23,000 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs