ITAC Assessment: LE0131
ITAC logo
ITAC Assessment: LE0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Investment Castings
NAICS
n/a
SIC 3324: Steel Investment Foundries
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 41,000
ft2
Annual Production 830
ton
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,137 4,915,101
kWh
Electricity Demand $159,349 16,815
kW-mo/yr
Natural Gas $247,708 32,962
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,624 - - $15,624
-
kW-mo/yr
-
02 2.3191: Use demand controller or load shedder $11,376 $4,500 - $11,376
-
kW-mo/yr
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,486 $500 - - $1,486
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $238 - $238
7,761
kWh
- -
05 2.2437: Recover waste heat from equipment $2,937 $6,200 - - $2,937
-
MMBtu
TOTAL RECOMMENDED $31,661 $11,200 $238
7,761
kWh
$27,000
-
kW-mo/yr
$4,423
-
MMBtu
TOTAL IMPLEMENTED $27,000 $4,500 - $27,000
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs