ITAC Assessment: LE0216
ITAC logo
ITAC Assessment: LE0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Spices
NAICS 311942: Spice and Extract Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 94,500
ft2
Annual Production 8,722
ton
Production Hrs. Annual 4,992
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,892 1,486,420
kWh
Electricity Demand $54,917 6,910
kW-mo/yr
Natural Gas $39,513 6,745
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,497 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,847 $1,200 $5,397
65,022
kWh
$1,450
-
kW-mo/yr
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,467 $4,000 $3,467
41,775
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,748 $2,000 - $2,748
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,613 $320 $1,613
19,438
kWh
-
05 2.4314: Use synthetic lubricant $429 $200 $342
4,123
kWh
$87
-
kW-mo/yr
06 2.7111: Reduce illumination to minimum necessary levels $2,078 $110 $1,587
14,166
kWh
$491
-
kW-mo/yr
07 2.7142: Utilize higher efficiency lamps and/or ballasts $10,315 $40,077 $7,870
94,814
kWh
$2,445
-
kW-mo/yr
TOTAL RECOMMENDED $27,497 $47,907 $20,276
239,338
kWh
$7,221
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs