ITAC Assessment: AM0060
ITAC logo
ITAC Assessment: AM0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STEEL CASING AND TUBING
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 69
Plant Area
n/a
Annual Production 6,600
ton
Production Hrs. Annual 4,144
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,358 6,276,671
kWh
Natural Gas $562,325 178,887
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8113: Purchase gas directly from a contract gas supplier $59,200 - - $59,200
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $11,080 $24,686 $(-870.0)
(-13,482)
kWh
$11,950
-
MMBtu
03 2.2514: Cover open tanks $9,300 - - $9,300
-
MMBtu
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,440 $900 $2,440
36,635
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $1,320 - - $1,320
-
MMBtu
06 2.6212: Turn off equipment during breaks, reduce operating time $1,210 $940 $1,210
38,101
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $540 $420 $540
17,585
kWh
-
08 2.2511: Insulate bare equipment $1,080 $1,080 - $1,080
-
MMBtu
TOTAL RECOMMENDED $86,170 $28,026 $3,320
78,839
kWh
$82,850
-
MMBtu
TOTAL IMPLEMENTED $69,580 $1,080 - $69,580
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs