ITAC Assessment: LL0276
ITAC logo
ITAC Assessment: LL0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Pipeline Accessories
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 32,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,798 301,244
kWh
Electricity Demand $5,385 6
kW-mo/yr
Electricity Fees $1,600 -
Natural Gas $12,238 1,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,051

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,971 $2,080 $1,869
23,655
kWh
$102 - -
02 4.611: Begin a practice of predictive / preventative maintenance $1,721 $150 $210
2,652
kWh
$11 - $1,500
03 2.2511: Insulate bare equipment $775 $438 - - $775
-
MMBtu
-
04 2.7224: Reduce space conditioning during non-working hours $567 $825 $537
6,801
kWh
$30 - -
05 2.6211: Conserve energy by efficient use of vending machines $437 $471 $414
5,245
kWh
$23 - -
06 2.7134: Use photocell controls $276 $90 $262
3,319
kWh
$14 - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $170 $30 $161
2,035
kWh
$9 - -
08 2.4239: Eliminate or reduce compressed air usage $47 $183 $45
567
kWh
$2 - -
TOTAL RECOMMENDED $5,964 $4,267 $3,498
44,274
kWh
$191 $775
-
MMBtu
$1,500
TOTAL IMPLEMENTED $1,051 $528 $262
3,319
kWh
$14 $775
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs