ITAC Assessment: MA0602
ITAC logo
ITAC Assessment: MA0602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Converted paper, foil and film
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 195
Plant Area 261,000
ft2
Annual Production 691,335
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $430,203 6,047,530
kWh
Electricity Demand $79,155 13,364
kW-mo/yr
Electricity Fees $3,432 -
Natural Gas $521,600 61,959
MMBtu
Fuel Oil #2 $79,027 7,042
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,536

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $79,413 $172,300 $(-7,946.0)
(-111,700)
kWh
$(-2,241.0)
-
kW-mo/yr
$89,600
-
MMBtu
02 2.2212: Use minimum safe oven ventilation $71,115 $115,075 $(-4,977.0)
(-69,800)
kWh
$(-784.0)
-
kW-mo/yr
$76,876
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $19,335 $96,992 $17,019
238,700
kWh
$2,316
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,691 $749 $7,622
106,900
kWh
$1,069
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $8,388 $4,050 - - $8,388
-
MMBtu
06 2.6231: Utilize controls to operate equipment only when needed $7,526 $8,755 $1,290
18,100
kWh
- $6,236
-
MMBtu
07 2.3212: Optimize plant power factor $1,918 $700 $1,518
21,300
kWh
$400
-
kW-mo/yr
-
08 2.2511: Insulate bare equipment $1,122 $950 - - $1,122
-
MMBtu
TOTAL RECOMMENDED $197,508 $399,571 $14,526
203,500
kWh
$760
-
kW-mo/yr
$182,222
-
MMBtu
TOTAL IMPLEMENTED $37,536 $102,741 $24,641
345,600
kWh
$3,385
-
kW-mo/yr
$9,510
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs