| SU0213 #08 Y:2005 | 08 | 2005 | Install compressor air intakes in coolest locations | $2,629 | $494 | |
| SU0213 #07 Y:2005 | 07 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,469 | $901 | |
| SU0213 #06 Y:2005 | 06 | 2005 | Use synthetic lubricant | $23,908 | $1,000 | |
| SU0213 #05 Y:2005 | 05 | 2005 | Utilize higher efficiency lamps and/or ballasts | $977 | - | |
| SU0213 #04 Y:2005 | 04 | 2005 | Pay bills on time to avoid late fees | $3,146 | - | |
| SU0213 #03 Y:2005 | 03 | 2005 | Reduce the pressure of compressed air to the minimum required | $4,021 | - | |
| SU0213 #02 Y:2005 | 02 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $9,343 | - | |
| SU0213 #01 Y:2005 | 01 | 2005 | Change rate schedules or other changes in utility service | $65,094 | - | |
| WI0495 #09 Y:2005 | 09 | 2005 | Recharge batteries on during off-peak demand periods | $242 | $200 | |
| WI0495 #08 Y:2005 | 08 | 2005 | Make a practice of turning off lights when not needed | $322 | $150 | |
| WI0495 #07 Y:2005 | 07 | 2005 | Use waste heat from flue gases to heat space conditioning air | $1,135 | $1,500 | |
| WI0495 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $1,800 | $1,280 | |
| WI0495 #05 Y:2005 | 05 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $2,165 | - | |
| WI0495 #04 Y:2005 | 04 | 2005 | Install automatic stack damper | $2,655 | $3,400 | |
| WI0495 #03 Y:2005 | 03 | 2005 | Lower temperature during the winter season and vice-versa | $3,320 | $360 | |
| WI0495 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $14,256 | $32,760 | |
| WI0495 #01 Y:2005 | 01 | 2005 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $162,672 | $360,000 | |
| WI0494 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $207 | $640 | |
| WI0494 #05 Y:2005 | 05 | 2005 | Recover waste heat from equipment | $1,037 | $1,000 | |
| WI0494 #04 Y:2005 | 04 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $4,060 | $6,060 |