3,119
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WI0497 #06 Y:2005 | 06 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,470 | $60 | |
| WI0497 #05 Y:2005 | 05 | 2005 | Turn off equipment when not in use | $4,656 | $500 | |
| WI0497 #04 Y:2005 | 04 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $12,421 | - | |
| WI0497 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $33,445 | $86,400 | |
| WI0497 #02 Y:2005 | 02 | 2005 | Eliminate or reduce compressed air usage | $42,415 | $4,000 | |
| WI0497 #01 Y:2005 | 01 | 2005 | Purchase new equipment to reduce material use / cost | $72,000 | $85,000 | |
| SU0217 #08 Y:2005 | 08 | 2005 | Optimize plant power factor | $3,979 | $14,487 | |
| SU0217 #07 Y:2005 | 07 | 2005 | Preheat boiler makeup water with waste process heat | $6,167 | $2,280 | |
| SU0217 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $7,934 | $652 | |
| SU0217 #05 Y:2005 | 05 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,763 | $954 | |
| SU0217 #04 Y:2005 | 04 | 2005 | Analyze flue gas for proper air/fuel ratio | $10,785 | $500 | |
| SU0217 #03 Y:2005 | 03 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $9,819 | - | |
| SU0217 #02 Y:2005 | 02 | 2005 | Reduce the pressure of compressed air to the minimum required | $16,273 | - | |
| SU0217 #01 Y:2005 | 01 | 2005 | Change rate schedules or other changes in utility service | $18,867 | - | |
| MI0114 #09 Y:2005 | 09 | 2005 | Use optimum size and capacity equipment | $3,521 | $4,628 | |
| MI0114 #08 Y:2005 | 08 | 2005 | Upgrade controls on compressors | $3,882 | - | |
| MI0114 #07 Y:2005 | 07 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,896 | $1,074 | |
| MI0114 #06 Y:2005 | 06 | 2005 | Turn off equipment when not in use | $9,392 | $77 | |
| MI0114 #05 Y:2005 | 05 | 2005 | Meter recycled water (to reduce sewer charges) | $9,790 | $4,360 | |
| MI0114 #04 Y:2005 | 04 | 2005 | Insulate bare equipment | $2,983 | $225 |