Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,090

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Paper manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0213 #08 Y:2005 Install compressor air intakes in coolest locations $2,629 $494
SU0213 #07 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $5,469 $901
SU0213 #06 Y:2005 Use synthetic lubricant $23,908 $1,000
SU0213 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $977 -
SU0213 #04 Y:2005 Pay bills on time to avoid late fees $3,146 -
SU0213 #03 Y:2005 Reduce the pressure of compressed air to the minimum required $4,021 -
SU0213 #02 Y:2005 Utilize energy-efficient belts and other improved mechanisms $9,343 -
SU0213 #01 Y:2005 Change rate schedules or other changes in utility service $65,094 -
WI0495 #09 Y:2005 Recharge batteries on during off-peak demand periods $242 $200
WI0495 #08 Y:2005 Make a practice of turning off lights when not needed $322 $150
WI0495 #07 Y:2005 Use waste heat from flue gases to heat space conditioning air $1,135 $1,500
WI0495 #06 Y:2005 Install compressor air intakes in coolest locations $1,800 $1,280
WI0495 #05 Y:2005 Reschedule plant operations or reduce load to avoid peaks $2,165 -
WI0495 #04 Y:2005 Install automatic stack damper $2,655 $3,400
WI0495 #03 Y:2005 Lower temperature during the winter season and vice-versa $3,320 $360
WI0495 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $14,256 $32,760
WI0495 #01 Y:2005 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $162,672 $360,000
WI0494 #06 Y:2005 Install compressor air intakes in coolest locations $207 $640
WI0494 #05 Y:2005 Recover waste heat from equipment $1,037 $1,000
WI0494 #04 Y:2005 Reschedule plant operations or reduce load to avoid peaks $4,060 $6,060