Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,167

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Paper manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0615 #15 Y:2026 Minimize use of outside make-up air for ventilation except when used for economizer cycle $229 $834
LE0615 #14 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,105 $12,000
LE0615 #13 Y:2026 Replace existing hvac unit with high efficiency model $5,715 $5,715
LE0615 #12 Y:2026 Install compressor air intakes in coolest locations $1,333 $7,000
LE0615 #11 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $5,064 $24,000
LE0615 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,316 $6,093
LE0615 #09 Y:2026 Use / purchase optimum sized compressor $11,046 $45,405
LE0615 #08 Y:2026 Replace existing chiller with high efficiency model $3,592 $22,000
LE0615 #07 Y:2026 Use flue gases in radiant heater for space heating, ovens, etc $1,313 $2,200
LE0615 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $958 $2,000
LE0615 #05 Y:2026 Install occupancy sensors $71 $140
LE0615 #04 Y:2026 Re-use or recycle hot or cold process exhaust air $843 $950
LE0615 #03 Y:2026 Use flue gases in radiant heater for space heating, ovens, etc $50,403 $29,620
LE0615 #02 Y:2026 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $3,636 $1,200
LE0615 #01 Y:2026 Install timers and/or thermostats $1,262 -
UU0301 #09 Y:2026 Use solar heat to make electricty $589,000 $19,489,000
UU0301 #08 Y:2026 Install occupancy sensors $3,980 $27,440
UU0301 #07 Y:2026 Use heat from boiler blowdown to preheat boiler feed water $4,360 $9,520
UU0301 #06 Y:2026 Install desiccant humidity control system $86,700 $86,700
UU0301 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $18,700 $11,400