3,107
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT1002 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $115,363 | $829,891 |
n/a
|
| GT1002 #05 Y:2025 | 05 | 2025 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $366,345 | $1,207,500 |
n/a
|
| GT1002 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $7,772 | $20,582 |
n/a
|
| GT1002 #03 Y:2025 | 03 | 2025 | Insulate bare equipment | $3,807 | $4,806 |
n/a
|
| GT1002 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $1,240 | $930 |
n/a
|
| GT1002 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $40,202 | $1,850 |
n/a
|
| UF0644 #09 Y:2025 | 09 | 2025 | Re-arrange equipment layout to reduce labor costs | $1,008 | $1,360 |
n/a
|
| UF0644 #08 Y:2025 | 08 | 2025 | Improve space comfort conditioning | $47,532 | $12,400 |
n/a
|
| UF0644 #07 Y:2025 | 07 | 2025 | Modify storage space to avoid rental of a warehouse | $54,000 | - |
n/a
|
| UF0644 #06 Y:2025 | 06 | 2025 | Install an uninteruptable power supply | $52,901 | $24,080 |
n/a
|
| UF0644 #05 Y:2025 | 05 | 2025 | Install equipment to move product | $138,087 | $384,000 |
n/a
|
| UF0644 #04 Y:2025 | 04 | 2025 | Use fixtures to reduce machine changeout times | $148,800 | $220,000 |
n/a
|
| UF0644 #03 Y:2025 | 03 | 2025 | Use or replace with energy efficient substitutes | $46,082 | $37,000 |
n/a
|
| UF0644 #02 Y:2025 | 02 | 2025 | Install soft-start to eliminate nuisance trips | $1,140 | $4,477 |
n/a
|
| UF0644 #01 Y:2025 | 01 | 2025 | Use demand controller or load shedder | $7,758 | $3,728 |
n/a
|
| DL0270 #04 Y:2025 | 04 | 2025 | Install timers and/or thermostats | $4,669 | - |
n/a
|
| DL0270 #03 Y:2025 | 03 | 2025 | Remove or close off unneeded compressed air lines | $40,280 | - |
n/a
|
| DL0270 #02 Y:2025 | 02 | 2025 | Use / purchase optimum sized compressor | $60,870 | - |
n/a
|
| DL0270 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $78,750 | $30,000 |
n/a
|
| WM0255 #05 Y:2025 | 05 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $1,026 | $2,200 |
n/a
|