3,028
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LE0600 #10 Y:2025 | 10 | 2025 | Replace existing hvac unit with high efficiency model | $2,545 | $9,511 |
n/a
|
LE0600 #09 Y:2025 | 09 | 2025 | Install compressor air intakes in coolest locations | $1,420 | $4,000 |
n/a
|
LE0600 #08 Y:2025 | 08 | 2025 | Utilize higher efficiency lamps and/or ballasts | $16,572 | $26,690 |
n/a
|
LE0600 #07 Y:2025 | 07 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,555 | $7,500 |
n/a
|
LE0600 #06 Y:2025 | 06 | 2025 | Use properly designed and sized hvac equipment | $14,877 | $20,000 |
n/a
|
LE0600 #05 Y:2025 | 05 | 2025 | Re-use or recycle hot or cold process exhaust air | $2,757 | $2,500 |
n/a
|
LE0600 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,149 | $2,600 |
n/a
|
LE0600 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $6,925 | $210 |
n/a
|
LE0600 #02 Y:2025 | 02 | 2025 | Install timers and/or thermostats | $92,399 | $480 |
n/a
|
LE0600 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,082 | - |
n/a
|
NL0110 #05 Y:2025 | 05 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $527 | $700 |
n/a
|
NL0110 #04 Y:2025 | 04 | 2025 | Meter waste water | $4,494 | $2,400 |
n/a
|
NL0110 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,063 | $4,500 |
n/a
|
NL0110 #02 Y:2025 | 02 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $7,360 | $160 |
n/a
|
NL0110 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $262,812 | $4,671,994 |
n/a
|
WM0241 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $96 | $368 |
n/a
|
WM0241 #04 Y:2025 | 04 | 2025 | Re-use or recycle hot or cold process exhaust air | $552 | $635 |
n/a
|
WM0241 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,471 | $2,249 |
n/a
|
WM0241 #02 Y:2025 | 02 | 2025 | Close holes and openings in building such as broken windows | $1,959 | $6,000 |
n/a
|
WM0241 #01 Y:2025 | 01 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $25,950 | - |
n/a
|