Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,107

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Paper manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1002 #06 Y:2025 Use solar heat to make electricty $115,363 $829,891
GT1002 #05 Y:2025 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $366,345 $1,207,500
GT1002 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,772 $20,582
GT1002 #03 Y:2025 Insulate bare equipment $3,807 $4,806
GT1002 #02 Y:2025 Install occupancy sensors $1,240 $930
GT1002 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $40,202 $1,850
UF0644 #09 Y:2025 Re-arrange equipment layout to reduce labor costs $1,008 $1,360
UF0644 #08 Y:2025 Improve space comfort conditioning $47,532 $12,400
UF0644 #07 Y:2025 Modify storage space to avoid rental of a warehouse $54,000 -
UF0644 #06 Y:2025 Install an uninteruptable power supply $52,901 $24,080
UF0644 #05 Y:2025 Install equipment to move product $138,087 $384,000
UF0644 #04 Y:2025 Use fixtures to reduce machine changeout times $148,800 $220,000
UF0644 #03 Y:2025 Use or replace with energy efficient substitutes $46,082 $37,000
UF0644 #02 Y:2025 Install soft-start to eliminate nuisance trips $1,140 $4,477
UF0644 #01 Y:2025 Use demand controller or load shedder $7,758 $3,728
DL0270 #04 Y:2025 Install timers and/or thermostats $4,669 -
DL0270 #03 Y:2025 Remove or close off unneeded compressed air lines $40,280 -
DL0270 #02 Y:2025 Use / purchase optimum sized compressor $60,870 -
DL0270 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $78,750 $30,000
WM0255 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,026 $2,200