Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0114 #07 Y:2025 Use or replace with energy efficient substitutes $521 $191
NL0114 #06 Y:2025 Optimize filtration cleaning / replacement to minimize air resistance $748 $2,330
NL0114 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,055 $515
NL0114 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,459 $45
NL0114 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $3,060 $90
NL0114 #02 Y:2025 Remove or close off unneeded compressed air lines $5,808 $510
NL0114 #01 Y:2025 Install sensors to detect and avoid jams $200,000 $80,000
TT0331 #08 Y:2025 Use photocell controls $290 $1,300
TT0331 #07 Y:2025 Use solar heat to make electricty $75,885 $312,848
TT0331 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,685 $9,000
TT0331 #05 Y:2025 Initiate a program to acquire iso certification $4,661 $15,000
TT0331 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $256 $450
TT0331 #03 Y:2025 Recover waste heat from equipment $2,170 $3,000
TT0331 #02 Y:2025 Minimize water usage $1,508 $400
TT0331 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $393 $60
AS0600 #07 Y:2025 Conserve energy by efficient use of vending machines $312 $279
AS0600 #06 Y:2025 Pay bills on time to avoid late fees $1,132 $39
AS0600 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,357 $495
AS0600 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $2,289 $15,555
AS0600 #03 Y:2025 Eliminate old stock and modify inventory control $8,750 $276