Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

344

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Wood window and door manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0036 #04 Y:2024 Optimize plant power factor $6,170 $16,268
NT0036 #03 Y:2024 Turn off equipment during breaks, reduce operating time $3,825 -
NT0036 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,972 $5,609
NT0036 #01 Y:2024 Reduce space conditioning during non-working hours $688 -
UW2408 #10 Y:2024 Use or replace with energy efficient substitutes $145,176 $144,799
UW2408 #09 Y:2024 Use solar heat to make electricty $61,411 $421,830
UW2408 #08 Y:2024 Insulate feedwater tank $2,901 $290
UW2408 #07 Y:2024 Insulate glazing, walls, ceilings, and roofs $34,834 $133,560
UW2408 #06 Y:2024 Recycle air for heating, ventilation and air conditioning $35,732 $2,619
UW2408 #05 Y:2024 Optimize plant power factor $45,697 $89,919
UW2408 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $32,306 $2,080
UW2408 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $8,014 -
UW2408 #02 Y:2024 Install / repair insulation on steam lines $116,105 $13,500
UW2408 #01 Y:2024 Install vinyl strip / high speed / air curtain doors $13,069 $103,000
OR0785 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $323 -
OR0785 #04 Y:2023 Size electric motors for peak operating efficiency $2,475 $16,140
OR0785 #03 Y:2023 Optimize plant power factor $3,141 $4,510
OR0785 #02 Y:2023 Install timers and/or thermostats $4,224 $1,583
OR0785 #01 Y:2023 Add equipment/ operators to reduce production bottleneck $1,209,151 $28,500
SU0543 #10 Y:2023 Utilize higher efficiency lamps and/or ballasts $2,021 $4,746