ITAC Assessment: UW2408
ITAC logo
ITAC Assessment: UW2408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Solide stile and rail wood doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $50
M
to 100
M
# of Employees 216
Plant Area 356,760
ft2
Annual Production 70,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $617,253 10,079,000
kWh
Electricity Demand $284,955 36,900
kW-mo/yr
Electricity Fees $89,227 -
LPG $227,211 14,726
MMBtu
Waste Disposal Costs
Water Usage $3,192 53,855
Tgal
Water Disposal $52,330 53,855
Tgal
TOTAL YEARLY COSTS $1,274,168
RECOMMENDED SAVINGS* $495,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $13,069 $103,000 - - - $13,069
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $116,105 $13,500 - - - $116,105
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,014 - $5,277
86,226
kWh
$2,737
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $32,306 $2,080 $26,082
426,174
kWh
$6,224
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $45,697 $89,919 - $26,778
-
kW-mo/yr
$18,919 -
06 2.7313: Recycle air for heating, ventilation and air conditioning $35,732 $2,619 $35,732
583,858
kWh
- - -
07 2.7491: Insulate glazing, walls, ceilings, and roofs $34,834 $133,560 $34,834
569,176
kWh
- - -
08 2.2123: Insulate feedwater tank $2,901 $290 - - - $2,901
-
MMBtu
09 2.9114: Use solar heat to make electricty $61,411 $421,830 $52,361
855,564
kWh
$9,050
-
kW-mo/yr
- -
10 2.4322: Use or replace with energy efficient substitutes $145,176 $144,799 $84,015
1,372,800
kWh
$61,161
-
kW-mo/yr
- -
TOTAL RECOMMENDED $495,245 $911,597 $238,301
3,893,798
kWh
$105,950
-
kW-mo/yr
$18,919 $132,075
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs