ITAC Assessment: OR0785
ITAC logo
ITAC Assessment: OR0785
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Accordion Doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 170,000
ft2
Annual Production 47
thousand feet
Production Hrs. Annual 2,040
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,853 439,912
kWh
Electricity Demand $22,612 3,106
kW-mo/yr
Electricity Fees $7,345 -
Natural Gas $39,951 4,426
MMBtu
LPG $2,721 72
MMBtu
Other Gas $3,652 1
MMBtu
Waste Disposal Costs
Water Usage $68 22
Tgal
Other Liquid (non-haz) $5,708 1
gal
TOTAL YEARLY COSTS $104,910
RECOMMENDED SAVINGS* $1,219,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $323

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $1,209,151 $28,500 - - - - $1,209,151
02 2.7261: Install timers and/or thermostats $4,224 $1,583 - - - $4,224
-
MMBtu
-
03 2.3212: Optimize plant power factor $3,141 $4,510 - - $3,141 - -
04 2.4131: Size electric motors for peak operating efficiency $2,475 $16,140 $1,357
26,112
kWh
$1,118
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $323 - $149
2,871
kWh
$174
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $1,219,314 $50,733 $1,506
28,983
kWh
$1,292
-
kW-mo/yr
$3,141 $4,224
-
MMBtu
$1,209,151
TOTAL IMPLEMENTED $323 - $149
2,871
kWh
$174
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs