Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,609

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0638 #08 Y:2025 Replace old machine with new automatic multi-station tool $144,871 $300,000
UF0638 #07 Y:2025 Install equipment to move product $234,219 $330,000
UF0638 #06 Y:2025 Minimize condenser cooling water temperature $846 $774
UF0638 #05 Y:2025 Install timers and/or thermostats $1,257 $427
UF0638 #04 Y:2025 Install soft-start to eliminate nuisance trips $3,072 $10,464
UF0638 #03 Y:2025 Use most efficient type of electric motors $14,054 $12,848
UF0638 #02 Y:2025 Use demand controller or load shedder $16,202 $9,357
UF0638 #01 Y:2025 Improve air circulation with destratification fans / other methods $20,234 $31,063
LT8430 #03 Y:2025 Install occupancy sensors $19 $39
LT8430 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,876 $190
LT8430 #01 Y:2025 Turn off equipment when not in use $1,098 $1,502
NL0114 #07 Y:2025 Use or replace with energy efficient substitutes $521 $191
NL0114 #06 Y:2025 Optimize filtration cleaning / replacement to minimize air resistance $748 $2,330
NL0114 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,055 $515
NL0114 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,459 $45
NL0114 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $3,060 $90
NL0114 #02 Y:2025 Remove or close off unneeded compressed air lines $5,808 $510
NL0114 #01 Y:2025 Install sensors to detect and avoid jams $200,000 $80,000
TT0331 #08 Y:2025 Use photocell controls $290 $1,300
TT0331 #07 Y:2025 Use solar heat to make electricty $75,885 $312,848