Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,622

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2602 #05 Y:2026 Use solar heat to make electricty $31,666 $375,570
LS2602 #04 Y:2026 Replace existing equipment with more suitable substitutes $38,310 $276,975
LS2602 #03 Y:2026 Clean or color roof to reduce solar load $3,415 $10,866
LS2602 #02 Y:2026 Upgrade controls on compressors $3,960 $12,500
LS2602 #01 Y:2026 Replace fossil fuel equipment with electrical equipment $272,631 $722,745
SD0685 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $751 -
SD0685 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,543 $10,618
SD0685 #06 Y:2025 Use most efficient type of electric motors $155 $4,450
SD0685 #05 Y:2025 Install direct acting units in place of compressed air pressure system in safety system $254 $1,200
SD0685 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,111 $3,285
SD0685 #03 Y:2025 Use battery storage for demand control $556,956 $109,721
SD0685 #02 Y:2025 Use solar heat to make electricty $11,104 $28,902
SD0685 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,078 $2,362
UF0638 #08 Y:2025 Replace old machine with new automatic multi-station tool $144,871 $300,000
UF0638 #07 Y:2025 Install equipment to move product $149,904 $330,000
UF0638 #06 Y:2025 Minimize condenser cooling water temperature $846 $774
UF0638 #05 Y:2025 Install timers and/or thermostats $1,257 $427
UF0638 #04 Y:2025 Install soft-start to eliminate nuisance trips $3,072 $10,464
UF0638 #03 Y:2025 Use most efficient type of electric motors $14,054 $12,848
UF0638 #02 Y:2025 Use demand controller or load shedder $16,202 $9,357