206
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Reconstituted wood product manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0427 #01 Y:2011 | 01 | 2011 | Burn a less expensive grade of fuel | $155,882 | $10,000 | |
| NC0416 #07 Y:2010 | 07 | 2010 | Install occupancy sensors | $415 | $949 | |
| NC0416 #06 Y:2010 | 06 | 2010 | Utilize higher efficiency lamps and/or ballasts | $284 | $568 | |
| NC0416 #05 Y:2010 | 05 | 2010 | Utilize higher efficiency lamps and/or ballasts | $6,679 | $30,438 | |
| NC0416 #04 Y:2010 | 04 | 2010 | Recover waste heat from equipment | $11,462 | $6,800 | |
| NC0416 #03 Y:2010 | 03 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,948 | $100 | |
| NC0416 #02 Y:2010 | 02 | 2010 | Reduce the pressure of compressed air to the minimum required | $14,117 | $50 | |
| NC0416 #01 Y:2010 | 01 | 2010 | Keep boiler tubes clean | $359,066 | $411,700 | |
| DL0059 #07 Y:2010 | 07 | 2010 | Turn off equipment when not in use | $580 | $40 | |
| DL0059 #06 Y:2010 | 06 | 2010 | Install timers and/or thermostats | $2,552 | $1,038 | |
| DL0059 #05 Y:2010 | 05 | 2010 | Turn off equipment during breaks, reduce operating time | $3,616 | $400 | |
| DL0059 #04 Y:2010 | 04 | 2010 | Turn off equipment during breaks, reduce operating time | $4,931 | $40 | |
| DL0059 #03 Y:2010 | 03 | 2010 | Turn off equipment when not in use | $7,300 | $650 | |
| DL0059 #02 Y:2010 | 02 | 2010 | Use compressor air filters | $6,340 | $12,965 | |
| DL0059 #01 Y:2010 | 01 | 2010 | Install timers and/or thermostats | $5,800 | $520 | |
| OR0549 #05 Y:2009 | 05 | 2009 | Install / repair insulation on steam lines | $8,800 | $3,500 | |
| OR0549 #04 Y:2009 | 04 | 2009 | Utilize energy-efficient belts and other improved mechanisms | $7,682 | - | |
| OR0549 #03 Y:2009 | 03 | 2009 | Reduce combustion air flow to optimum | $28,000 | $700 | |
| OR0549 #02 Y:2009 | 02 | 2009 | Preheat combustion air with waste heat | $46,600 | $27,000 | |
| OR0549 #01 Y:2009 | 01 | 2009 | Replace existing equipment with more suitable substitutes | $170,135 | $100,000 |