Assessment Year | 2010 |
---|---|
Principal Product | Wood door skins |
NAICS | 321219: Reconstituted Wood Product Manufacturing |
SIC | 2493: Reconstituted Wood Products |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
100,000
ft2
|
Annual Production | 6,500,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,099,743 | 34,441,200 |
kWh
|
$0.032 |
Electricity Demand | $500,257 | 57,183 |
kW-mo/yr
|
$8.75 |
Natural Gas | $398,965 | 65,297 |
MMBtu
|
$6.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $400,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,764 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1232: Keep boiler tubes clean | $359,066 | $411,700 | - | - |
$359,066
-
MMBtu
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,117 | $50 |
$9,542
289,583
kWh
|
$4,575
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,948 | $100 |
$8,478
257,288
kWh
|
$4,070
-
kW-mo/yr
|
- | $(-2,400.0) | $(-1,200.0) | |
04 | 2.2437: Recover waste heat from equipment | $11,462 | $6,800 | - | - |
$11,462
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,679 | $30,438 |
$5,533
167,921
kWh
|
$2,496
-
kW-mo/yr
|
- | $(-1,837.0) | $487 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $284 | $568 |
$197
5,973
kWh
|
$87
-
kW-mo/yr
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $415 | $949 |
$415
12,580
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $400,971 | $450,605 |
$24,165
733,345
kWh
|
$11,228
-
kW-mo/yr
|
$370,528
-
MMBtu
|
$(-4,237.0) | $(-713.0) | ||
TOTAL IMPLEMENTED | $23,764 | $1,667 |
$18,632
565,424
kWh
|
$8,732
-
kW-mo/yr
|
- | $(-2,400.0) | $(-1,200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs